Jun 1993
Relocate loby door & build curb wall.
-
Aug 1994
Retrofit sprinkler system per plans.
-
Jul 2006
Assembly occup is not allowed in this building.proposedexistingas apprv only complies with "b" occp.any future res. "r"or assembly"a"occup would req both exit stairs to discharge directly to public way.new ten story horiz addition toexisting12 story historical building.existing3 story building was demolish under 200705252255.
-
Dec 2009
Construction of office t.i. on 4th. & 5th. floors of an existing building. construction of 8-offices, interior partitions & wall finishes. ceiling, lighting & hvac. architectural drawings only. electrical, mechanical, fire alarm & fire sprinkler is design/build & will be submitted under separate permits.
-
Jan 2010
8th floor-interior tenant improvements on 8th floor of existing building, includes construction of enclosed offices, interior partitions, ceilings, and finishes throughout. architectural drawings only. mechanical, electrical, fire alarm, and fire sprinklers wil be under separate permit.
-
Jan 2010
Hvac tenant improvements of 4th and 5th floors. permit application 2009.12.18.3458 for arch. reference. hvac design build allied heating and aic cooditioning inc.
-
Jan 2010
8th floor-office t.i. mechanical bldng permit application 201001134651-install hvac, fan coils, ducts & refer piping. field verify that all hvac shuts down on area smke alrm as noted on plans. exception: fan coil one unit-2 & 8-3 and 8-6, 8-7 & 8-8 are in 2 seperated smoke zones & total cfm is less than 2000 cfm each.
-
Feb 2010
Permit application for electrical lighting: title 24 only. permit application 2009.12.18.3458 for architectural plans reference. fire alarm, sprinklers, mechanical under separate permit.
-
Aug 2010
Remodel of 2 rooms on south portion of 11th floor of existing office building. existing condition of 2 rooms are finished shell. rooms will be conference room and warming kitchen for meetings. ref 200607136416s, s-3. tco has been issued but final pending.
-
Oct 2010
9th floor - tenant improvement including minor demolition, new partitions, lighting & associated mechanical & electrical.
-
Dec 2010
11th floor - construction of interior walls ceiling & finishes. mep under separate permit.
-
Feb 2011
Construction of interior improvement for a business lounge on the 11th floor, including installation of mechanical systems electrical, lighting, and plumbing and grease duct for a new kichen.
-
Jun 2011
10/f - new non-load bearing partitions, ceilings and finishes, mechanical and electrical included. fire sprinkler and life safety under sep permit.
-
Aug 2011
8th floor replacement of rated pair doors addition of non-structural partitions, doors millwork. mep, life safety & fire sprinkler under separate permit.
-
Aug 2011
7th floor-t.i. includes demolition of non structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing & life safety work will ne design build & submitted for permit seperately. building is fully sprinklered.
-
Sep 2011
8th floor-refer to permit application 2011-0808-1959-mechanical & electrical-re-configure ductwork to fit tenants space & occupancies as neccessary. install new thermostats, re-balance cfm's in air registers.
-
Sep 2011
7th floor ti: this permit is to submitt t-24 mechanical drawing seperately. the arch building permit # 201108172603.
-
Oct 2011
6th fl. interior improvement on the 6th fl. new interior non structural partitions. new mep, new furniture, lighting, ceilings, doors, hardware, finishes typical.
-
Jan 2012
Barrier removal to provide new accessible elevator to serve 2nd floor restaurant space. t.i under seperate permit.
-
May 2012
2nd floor-tenant improvement for hakkasan restaurant-minor work in basement storage area, ground floor & entry. no exterior work. fire alarms and sprinklers under separate permit.
-
May 2012
Interior t.i. on the 4th floor. new doors and hardware. mechanical and electrical work included.
-
Aug 2012
Remove existing temp lights, construct new partitions, ceilings, lighting, finishes & mep work. no structural work. interior only. smoke control building- sprinklers and fire alarm separate permit.
-
Aug 2012
Exterior modifications and architectural work at historic lobbies for work approved under 2012-05-03-9699. no changes to interior layout or approved occupant load. exterior window work. louvers approved under permit application 2011-1201-9874.
-
Oct 2012
Tenant improvement of existing bank (chase). new offices, non-structural partitions, new ceiling, new finishes, expansion of bank to existing vacant space. interior work only. f/a and sprinkler on separate permit.
-
Feb 2021
Work includes new exhaust ductwork & equipment serving greast duct system. exterior modification are limited to new louvers in existing wall at 2nd floor of recess in annex facade on geary st. all electrical & plumbing work will be design-build by the general contractor under a separate permit.
DBI holds 183 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 183. 8 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the year the building went up, the developer, the early tenants, who designed the open space and the date of the last recorded sale. The 1902 Mutual Savings Bank Building by William Curlett is the historic core; a 1964 addition was designed by Clark & Beuttler with Charles Moore, and a further Bloszies-designed addition followed, with one secondary source (CommercialCafe) giving 2009 for that addition's completion. Submit an update