25–35 Kearny Street
Union Square · San Francisco, CA 94108
-
1940
Stein's, photographed here in 1940 as a Streamline Moderne storefront, and since demolished.
-
Nov 1984
Build partition wall & new entrance door.
-
Jul 1989
Remodel/alteration/addition to main lobbly.
-
Aug 1995
Seismic upgrading (roof work only) plywood sheathing/parapet.
-
Sep 1995
To comply with umb ordinance.
-
Oct 1995
Instll fire svc & add a new fire pump to existingfire sprkl systm.
-
Apr 1997
Fire pump assembly.
-
May 1997
Soft demolition only under this permit.
-
May 1997
Cti 1 5th floor new finishes, low height ptns upgrade rstrm.
-
Jul 1997
Full height parition, adjust ceiling, upgrade restroom, door.
-
Aug 1998
Oti-1 el, me, sp 6th floor.
-
Oct 1998
Oti-2 6th floor el, me, sp.
-
Mar 2001
Soft demolition non-structural.
-
May 2002
Demolish aprox.125" of walls, buuild aprox 105" of walls, movf.five doors, install some light switc.
-
Feb 2005
New walls, new doors, new restrooms, new lighting, no structural.
-
Aug 2005
Demolish existing brick non bearing wall and replacew/storefront aluminum, replace mezzanine windows.
-
Jul 2006
Retail t.i. including partition wall, wall & floor finishes, toilet room finishes & lighting. no change to existing hvac.
-
Jul 2006
Retail t.i. including partition wall, wall & floor finishes, toilet room finish & lighting. no change to existing hvac.
-
Jul 2006
Tenant improvement of partial grd & 2nd floor to create business space for a walk-in & appt. cosmetic treatment facility. work on site to include addition of partition walls to divide tenant area.
-
Jan 2018
Minor permit to alter. change storefront, add (1) exhaus louver, ada doors & signage program.
-
Jun 2018
1/f: interior tenant improvement for cafe with less than 49 occupancy.
-
Sep 2018
New ada bathrooms/new storefront & doors, lights & hvac.
-
Mar 2019
1st floor, build out kitchen and dining area, build out basement prep kitchen, dishwasher, storage and restroom.
-
Jul 2020
2/f & 3/f: interior renovation to approximately 8, 352 sq ft. of business space. scope includes demolition of interior partitions, ceilings, lighting, plumbing and hvac. construction of interior partitions, ceilings, lighting, plumbing hvac and architectural finishes.
-
Aug 2021
Rev to permit application 202007019491 floors 2nd & 3rd: existing conditions in restroom area required some changes to restrooms. adding hvac to rooms 312 and 313.
-
Jan 2025
4th, 5th, and 6th floor; furnish and install 6 heatpumps and 4 coils with associated ductwork and refrigerant line sets.
DBI holds 77 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 77. 14 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update