Built.
-
April 8, 1908
John G. Sutton company contracted for plumbing and gas fitting on a building, at $5,160.
-
October 1971
A Redevelopment Agency survey of residential hotels counted the Graystone as a standard-condition residential hotel, with 70 units, four of them vacant.
-
Oct 1984
Sign - erect.
-
Oct 1984
Remodel bathroom.
-
Nov 1996
Umb/steel work/anchor bolts/partial plywood 2nd fl/close win.
-
Jun 1999
Reactivate 9621553.
-
Mar 2000
Removal of walls, wall & ceiling coverings, casework, plumbing fixtures.
-
May 2006
To increase job cost per district inspector 200104166882, 2000200605040665.
-
May 2007
Intall fire pump *(replace old existing pump, install or replace spsrinkler heads as requireed per code provide hydraulic calculations. (nfpa 13).
-
Apr 2010
Ext. remodel incl.: new storefront @ ground story @ 58 geary & 55 maiden lane. int. remodel incl.: new accessible ramp & north entry. 3-changing rooms, new fixtures & finishes @ 2-accessible wc's no change to basement.
-
Jul 2013
T.i.include: new ceilings & partitions, new electrical including light fixtures, new floor ceiling finish, selective demolition, new hvac, new plumbing, new ada lift, any exterior storefront change subject to minor permit to alter (historic planning) structural support framing for hvac will be under.
-
Jul 2013
Demolition of interior partitions, finishes, interior platforms at front, doors, ramp, raised floor, existing ac and duct. no exterior work, per ab017. ref 201307091416.
-
Oct 2013
Drop down fire sprinklers to new ceiling. 54 heads total.
-
Nov 2013
Install of steel shelving racks only. comply with complaint # 200341191.
-
Feb 2020
Like for like fire alarm installation for elevator modernization. replace facp, smoke det, manual pulls, monitoring module, relay module, install new monitoring modules to tie in with fs and tamper swtiches and smoke det for elevator recall. e spower supply and notification devices will remain used as.
-
May 2023
Addition to existing fire alarm. install 82 new low frequency sounders, 10 horn strobes, 6 new strobes, 3 power supplies. ref permit application 202002114073.
-
Jan 2025
The complexity of the energy code lighting compliance method requires review by intake. interior renovation of an existing vacant mercantile space. work includes demolition and new wall construction with remodel of space flooring and ceilings. no work to change building height or use to occur in cellar. existing.
-
Apr 2025
Anchorage of fixed and mobile retail shelving units.
-
Apr 2025
Modify an existing sprinkler system to accomodate new tenant ceiling plan ref 202501158364.
-
May 2025
Due to rennovation, remove all existing notification devices in the retail basement ground floor area in basement and ground. retail area add 8 ceiling horn strobes, 3 way horn strobes. 6 wall strobes and 1 relay module for music shutdown.
-
May 2025
Revision to pa 2025-0115-8364 hvac ductwork and inclusion of soffit detail.
DBI holds 59 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 59. 4 of them are nominal $1 street-space or sidewalk permits. 6 expired or cancelled permits are not shown.
Nearby
- 54 Geary Street Same street
- 70–80 Geary Street Same street
- 46 Geary Street Same block
- 69 Maiden Lane Same block
- 28–36 Geary Street Same block
- 18 Geary Street Same block
- 1 Kearny Street Around the corner
- 720 Market Street Around the corner