37.7879, −122.4046 A locator map appears here once a Mapbox token is configured.

70–80 Geary Street

Union Square · San Francisco, CA 94108

  • Built 1920
  • Store building
  • 6 stories
  • Zoned C3R
  • District 3
  • Historic status: historic resource
37.7879, −122.4046 Street View appears here once a Google Maps embed key is configured.
120,334 sq ftBuilding area
3,588 sq ftLot area
27Rooms · 11 baths

Permit history

  1. Apr 1981

    Additions alterations or repairs.

    Complete Permit 8102930 $$$ $96,000
  2. Dec 1991

    Voluntary seismic strengthning.

    Cancelled Permit 9123878 $$$ $400,000
  3. Sep 1993

    Install non structural partitions, kitchen bar, etc.

    Cancelled Permit 9316684 $$$ $275,000
  4. Oct 1993

    New storefronts & entrances. new interior. mechanical-fire systms.

    Complete Permit 9319123 $$$ $400,000
  5. Aug 2002

    Seismic upgrade to include all 3 lots that function as 1 building; replace of existingnon compliant stair.

    Complete Permit 200208154054 $$$ $1,800,000
  6. Mar 2003

    Tenant improvement at 2nd floor, work includes soft demolition, new partitions, doors, hardware, millwork & ceili.

    Expired Permit 200303190117 $$$ $200,000
  7. Jan 2005

    Tenant improvement for offices performing hair removal and skin rejuvenation services. clean raw she.

    Issued Permit 200501183425 $$$ $500,000
  8. Apr 2005

    Interior ti for existing shell per "stuart weitzman".

    Issued Permit 200504271001 $$$ $70,000
  9. May 2008

    4th floor: interior demolition of existing open office, install new aprtitions, partial drop ceiling, new residential style kitchen for use as photo studio set. m.e.p & fire life safety to be design build & filed under separate permit. no structural work to be performed.

    Complete Permit 200805232755 $$$ $413,176
  10. Feb 2010

    Joseph cozza salon on 2nd fl. ti at reception area, add 1/2 bath room at private office #1, remodel existing unisex bathroom. no exterior facade work. no exterior signage.

    Complete Permit 201002096195 $$$ $200,000
  11. Aug 2010

    T.i-6th. floor.: modification & expansion of existing t.i. space to include selective demolition & construction of non-load bearig partitions, new light fixtures, new office doors, frames & hardware & finishes. note: mep, life safety & fire sprinkler on separate permits.

    Complete Permit 201008189018 $$$ $876,626
  12. Aug 2010

    T.i-7th. floor.: modification & expansion of existing t.i. space to include selective demolition & construction of non-load bearing partitions, new light fixtures, new office doors frames & hardware & finishes. note: mep, life safety & fire sprinklers on separate permits.

    Complete Permit 201008189021 $$$ $573,572
  13. Aug 2010

    T.i.-5th. floor.: modification & expansion of existing t.i. space to include selective demolition & construction of non-load bearing partitions, new fixtures, new doors frames & millwork & finishes. note: mep, life safety & fire sprinkler on separate permits.

    Complete Permit 201008189013 $$$ $510,541
  14. Sep 2010

    Hvac tenant improvment on floors 5-6-7 per plans.

    Complete Permit 201009030206 $$$ $150,000
  15. Apr 2011

    Modification of existing tenant improvement space to include construction of non load bearing walls, new lighting, finishes.

    Complete Permit 201104083783 $$$ $300,000
  16. Mar 2015

    Int ti of existing retail space, work includes: new partitions, fixtures, finishes, mep. no change of use, no ext. work. fire protection under sep permit. meets cbc 7.12.1.8 for vertical openings. new convenience stair - 1/f & basement.

    Issued Permit 201503201484 $$$ $650,000
  17. Dec 2017

    6th fl - new partitions, finishes, lighting and equipment. meps, life safety or sprinller under separate permit. if needed.

    Complete Permit 201712085976 $$$ $1,100,000
  18. Dec 2017

    5th fl - new partitions, finishes, lighting and equipment. meps, life safety or sprinller under separate permit. if needed.

    Complete Permit 201712085973 $$$ $700,000
  19. Dec 2017

    7th fl - new partitions, finishes, lighting and equipment. meps, life safety or sprinler under separate permit. mep is required.

    Complete Permit 201712085968 $$$ $350,000
  20. Jul 2019

    2nd & 6th fl: modification of existing restroom to bring them to full compliance including selective demolition and construction of non-load bearing partitions, existing gypsum board ceiling with new light fixtures & re-switching, new stall partitions, new counter, new plumbing fixtures & accessories & new finishes.

    Complete Permit 201907166003 $$$ $428,000
  21. Jul 2019

    Modification of existing restroom to bring them to full compliance inlcuding selective demolition and construction of non-load bearing partitions, existing gypsum board with new lifhts fixtures and switching, new stall partitions, new counter, new plumbing fixtures and accessories and new finishes.

    Complete Permit 201907236666 $$$ $1,272,000
  22. Sep 2019

    Add 3 accessible all gender restrooms, construction of non-load bearing partitions, new gypsum board ceiling with new light fistures and switching, new sink, new plumbing, fixtures and accessories and new finishes.

    Complete Permit 201909131632 $$$ $140,469
  23. Nov 2019

    3rd fl: modification of existing t.i. to include selective demolition of non-load bearing partitions, new light fixtures, millwork, sink & new finishes.

    Issued Permit 201911066576 $$$ $730,000
  24. Nov 2019

    5th fl. modification of existing t.i. to include selective demolition & constructon of non -load bearing partitions, new light fixtures, millwork, sink & new finishes.

    Complete Permit 201911066580 $$$ $510,000
  25. Dec 2019

    Ste 401: modification of existing ti to include selective dmeo & construction of non-load bearing partitions, modications to ceiling grid & tile, new light fixtures, new office doors & frames, salvage & reuse of existing selected materials if practicable, millwork & new finishes. maher na.

    Complete Permit 201912179727 $$$ $750,000

DBI holds 195 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 195. 13 of them are nominal $1 street-space or sidewalk permits.

Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update