28–36 Geary Street
Office building · Union Square
-
1908
Built.
-
1908
The Rosenstock Building, designed by architect Albert Pissis.
-
January 30, 1908
M. V. Brady and Standard electric company contracted for brick and electrical work on a building, at $11,725.
-
April 9, 1910
The Rosenstock Building: the whole fifth floor, 62 feet on Geary running back 123 feet to Union Square Avenue, was leased to Marshall Field & Co. of Chicago for five years, at $18,000 in all, for wholesale offices and showrooms.
-
December 24, 1910
The Royal Worcester Corset Company of Worcester, Massachusetts, took a long lease on a whole floor of the Rosenstock Building and was fitting it out as its Pacific Coast office and warerooms.
-
Nov 1981
Additions alterations or repairs.
-
May 1983
New partitions, etc.
-
Jan 1984
Remodeling of existing fourth floor to include partitions.
-
Nov 1986
Tenant improvement for office use.
-
Jun 2002
Oti-1, 4th floor, ltg only.
-
Sep 2008
Tenant improvements, add 5 new water source heat pumps to existing space. tie into existing base building system. fire alarm on seperate permit.
-
Mar 2009
Minor alterations of storefront & signage. no interior work.
-
Apr 2009
Ground floor interior reconfiguration of retail space and mezzanine. mechanical & electrical under separate permit.
-
May 2009
Mechanical and electrical work for tenant improvement for retail space.
-
Jul 2010
Remove/replace existing storefront.
-
Aug 2010
A retail bakery - a new non-struct raised floor level throughout the space 7 new interior separating limited food preparation & dishwashing areas from retail & seating areas, mechanical mezzanine lcoated above the food prep, coffee svc & dishwashing areas.all new mep within the space, (no kitchen).
-
May 2013
Remodel of existing vacant retail storefront, interior ti to be submitted under separate permit, store interior to remain vacant per ab-019, signage to be sumbitted under separate permit. f/a, sprinklers under separate permit.
-
May 2013
Remodel of existing facade.
-
Jun 2013
Suite #500-interior office improvements-new carpet, paint, new interior non structural partitions, new millwork, cabinets, new interior doors. existing lighting to remain, no structural work. re-work existing mechanical & electrical. m.e. will be deferred submittal.
-
Jun 2013
Interior tenant improvement: rebuild mezzanine, new partitions, new lighting, power, hvac, new wheelchair lift and new stair to tennats basement stockroom. any adjustmesnts to existing sprinklers and fire alarm system under permit. store front renovation under separate pemit.
-
Aug 2013
Basement & 1st floor lobby-remodel & update finishes in basment stairwell. facade work filed under permit application 2013-0513-6767.
-
Jun 2014
Minor tenant improvement work: non-structural partitions & electrical work. new finishes in same locations, existing heavy duty grid ceiling assembly & light fixtures to remain. this project does not include a change of use or occupancy.
-
Jan 2015
7th floor t.i. to include demolition of partitions floor finishes, ceiling elements, new load bearing partitions, floor finishes and ceiling elements. mep under sepqarate permit. n/a for maher.
-
Mar 2015
Mechanical & electrical work for ti on the 7th floor maher - not req'd arch ref permit application.
-
Nov 2015
Replace storefront at retail space on geary st. replace building entrance on geary st. n/a for maher.
-
Mar 2018
Ti for new retail store @ ground floor. new fixtures, finishes, partitions, mep. adding 3 fsds. no exterior work, fire protection under sep permit.
-
Sep 2020
Tenant improvement on 7th fl to include new non-structural patitions. new mep distribution, new lighting & ceiling. new millwork, finishes, flooring & furniture.
-
Sep 2020
Interior improvements to incl new structural stair, new flooring and finishes. new flooring and furniture at roof deck.
-
Oct 2021
Replace existing conventional facp with new addressable fa panel. replace existing annunciator with a new one. providing and install a new cell communicator next to the nw annunciator in the lobby of the geary st. side of the building.
DBI holds 97 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 97. 9 of them are nominal $1 street-space or sidewalk permits. 1 cancelled permit is not shown.
Nearby
- 18 Geary Street Same street
- 46 Geary Street Same street
- 54 Geary Street Same block
- 58–66 Geary Street Same block
- 69 Maiden Lane Same block
- 70–80 Geary Street Same block
- One Kearny Around the corner
- 720 Market Street Around the corner