722–742 Market Street
Union Square · San Francisco, CA 94108
-
1912
Built.
-
1912
The Banker's Investment Building, designed by architect Frederick H. Meyer.
-
Oct 1982
Additions alterations or repairs.
-
Nov 1982
Additions alterations or repairs.
-
Dec 1982
Additions alterations or repairs.
-
Feb 1998
Tenant improvement at existing store new fixture, ceiling.
-
Jul 1999
T.i. on the 3rd floor/hv/ac.
-
May 2000
Install new electrical service & back up generator. install platform and inclosure on roof generato.
-
May 2005
Exterior facade repairs.repair holes & open seams in existingsheet metal cornice, remove existing paint/sealant.
-
Aug 2005
Oti-1, 3rd floor, el, me, ls, sp.
-
Mar 2007
Provide voluntary seismic upgrade. not in full compliance with sec. 3403.6, sfbc, 2001.
-
Apr 2015
Demolition and redesign of existing storefront along geary street. demolition inlcudes ground and second level. restoration of existing stone pilasters, to be repaired with patching mortar. structural framing & details for storefront / curtainwall under separate permit.
-
Apr 2015
Demolition and redesign of existing storefront along geary street. demolition inlcudes ground and level 2, storefront, partial floor slab and framing. mep under seperate permit.
-
Jul 2015
Interior demolition of non load bearing partitions, ceiling, lighting, doors, and partial 2nd floor slab and framing. scope also includes new structural floor framing around area of slab removal. will comply with ab-017.
-
Oct 2015
3rd floor: construct new non-structural partitions, new light fixtures, new doors and frames, new millwork, sink and finishes. m & e and lifesafty under seperate permit.
-
Sep 2017
#402- modification & expansion of an existing office to include selective demolition & construct of non-load bearing partitions, modify existing light fixtures & new including re-switching, new office doors & frames, salvage & reuse of existing selected materials & new finishes.
-
Mar 2018
Revision of permit application 201507232305, modify demolition of 2nd level mezzanine slab removal.
-
Nov 2018
Ground floor: interior renovation of existing dimised retail space: new fixtures, nw finishes, nw lighting, nw ceiling, nw electrical panels, nw ductwork. no exterior work. n/a for maher.
-
Jan 2019
1/f: t.i. of existing retail space - work includes fixtures, partitions, millwork, changing rooms, etc. change of occupancy from a-3 to m. maher n/a.
-
Feb 2019
Suite 67 - tenant improvement. minor interior demolition, relocation of restroom, new walls for fitting room, new drop ceiling, plumb, mechanical, electrical, new flooring and fixtures.
-
Mar 2019
Non-structural interior demolition, new drywall partitions, new drywall ceilings, new finishes, doors frames and harware, lighting, powder, and hvac duct alteration. fire alarm/fire sprinklers on deferred submittals. no plumbing on this project. n/a for maher.
-
May 2019
2nd floor tenant improvement: selective demolition of non-structural partitions, new non-structural partitions, light fixtures, glazing, doors, frames, millwork, existing sink and finishes.
-
Apr 2023
Building out of retail space including construction of rated and non rated partitions, restrooms, break room, office walls, door, storage room, finishes and lighting.
-
Apr 2023
5th floor tenant improvement to suite 550. minor demolition, construction of new non-loading bearing partition walls to create new office space. space types included are open office, conference rooms, phone rooms, pantry, mother's room, server room, elecrical closet, copy room, model room and.
-
Jul 2023
Phase 1: permit revision. phase 2a soft demolition of unused mep and landlord build out including construction of rated partitions, speculative tenant space to receive aesthetic improvements including general partch nd reapirs, finises, paint and lighting, new entry doors and store front windows.
-
Aug 2023
5th fl: mechanical & electrical work. ref arch permit application 202304175872. deferred permit int t.i). no ext work.
-
Dec 2023
Existing roofing membrane removal and full replacement of the membrane system. removal and disposal of existing wood curbs of mechanical units, and replacement with new. new roofing system to be installed shall be 2-ply sbs modified bituman roofing over tapered polyiso insulation.
DBI holds 336 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 336. 20 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 721 Market Street Same street
- 725–731 Market Street Same street
- 720 Market Street Same block
- 744 Market Street Same block
- 1 Kearny Street Same block
- 58–66 Geary Street Around the corner
- 28–36 Geary Street Around the corner
- 70–80 Geary Street Around the corner