37.7870, −122.4032 The map of the surrounding blocks draws here with JavaScript on.
Know This Place

District 6 · Block 3706, Lot 278 · ZIP 94103

30–34 3rd Street

Office building · Financial District

  • 5 stories
  • 51,743 ft2
  • 8,900 ft2 lot area
  • 4 residential units
  • Zoned C3R
  • Not a historic resource
Land$7,567,496
Improvements$15,761,471
Total assessed$23,328,967
37.7870, −122.4032 Street View appears here once a Google Maps embed key is configured.
  1. 1910

    Built.

  2. May 14, 1921

    A permit was sought for alterations: changing the front, tile and composition flooring and new fixtures for a restaurant, estimated at $2,500. The Mullen Mfg. Co. was named as contractor. The owner was the Press Grill and Oyster House, Inc.

    Building and Engineering News, San Francisco Public Library (Internet Archive)
  3. May 1, 1926

    A permit was sought for remodelling the front for a restaurant and installing fixtures, estimated at $1,600. The San Francisco Cabinet Works was named as architect and L. Simon as contractor.

    Building and Engineering News, San Francisco Public Library (Internet Archive)
  4. Mar 2015
    Permit 201503262014 $$$ $35,000

    New opening in existing interior brick wall. remove interior balcony @ 2nd floor. reframe basement level. partial removal of ground floor. space to remain vacant per ab-017, add concrete shearwall.

  5. Aug 2015
    Permit 201508194665 $$$ $110,000

    Install new wet fire sprinkler system with fire pump for previously unsprinklered existing 6 story building (587 sprinklers).

  6. Sep 2015
    Permit 201509227701 $$$ $230,000

    ***previous address 26 03rd street***arch permit 201503050030 *** fabricate & install: new outside air ductwork, new condensor water risers insulation air water balancing.

  7. Dec 2015
    Issued Permit 201512013790 $$$ $28,278

    Provide new fire alarm system for a core/shell building. additional devices will be added as tenants move in.

  8. Mar 2016
    Permit 201603020955 $$$ $450,000

    Tenant improvement consisting of new partitons, millwork, lighting, electrical, plumbing, mechanical.

  9. Mar 2016
    Permit 201603232804 $$$ $200,000

    Mechanical and electrical work for ti. ref pa 2016-0323-3802. maher na.

  10. Mar 2016
    Permit 201603242938 $$$ $400,000

    4th floor: ti - new non structural partitions, glazing, doors & millwork. mep /fire/life safety under sep permit. maher na.

  11. Mar 2016
    Permit 201603242953 $$$ $350,000

    2nd floor: ti to consist of new non structural partitions, maher na mep/fire/life safety under sep permit.

  12. Mar 2016
    Permit 201603242941 $$$ $300,000

    3rd floor: ti - new non structural partitions, glazing, doors & millwork. mep /fire/life safety under sep permit. maher na.

  13. Mar 2016
    Permit 201603242940 $$$ $260,000

    4th floor: ti - mep. ref pa 2016 0324 2938. maher na.

  14. Mar 2016
    Permit 201603242942 $$$ $250,000

    3rd floor: ti - mep - ref pa 2016 0324 2941. maher na.

  15. Apr 2016
    Permit 201604255548 $$$ $125,000

    Basement/1st floor: change of use ti consists of new interior partitions, millwork, glazing & doors. mep/fire/life safety under sep.

  16. Apr 2016
    Permit 201604255562 $$$ $50,000

    2nd floor: mechanical & ele work for ti 2016 0324 2953.

  17. Apr 2016
    Permit 201604265663 $$$ $100,000

    Basement/1st floor: mechanical & ele for ref pa 2016 0425 5548.

  18. May 2016
    Permit 201605096862 $$$ $39,555

    Provide fire alarm system for bld. add 1 40 watt zoned audio amp, 2 booster power supplies, 39 strobes, 67 speaker/strobes, 2 trim skirts. ref permit application 2015/12/01/3790. ref arch permit application 2015/03/05/0030. ref sprinkler permit application 2015/08/19/4665. ref mechanical permit application 2015/09/22/7701.

  19. May 2016
    Permit 201605318680 $$$ $71,500

    1st thru 6th floors: ref pa 2016-0323-2802: fire sprinklers. 1st floor relocate 14 pendents and add 3 ups 17 relocate 16 pendents 2nd floor ups 18 3rd floor relocate 16 penedents 13 ups 29 4th floor relocate 18 pendents add 18 up 26 5th floor relocate 18 poendents 8 ups 26 6th floor relocate 23 pendents add 4.

  20. May 2019
    Permit 201905130389 $$$ $60,000

    Ground floor: new non structural partitions, finishes, mechanical & electrical. equipment. no change in occupancy, use or area. mep, life safty and sprinklers under seperate permit. n/a for maher.

  21. Aug 2019
    Issued Permit 201908209252 $$$ $52,710

    Install new water source heat pump. ref permit application 201905130389. maher na.

  22. Nov 2019

    T-24 mechanical for work under permit application 201911157426.

  23. Nov 2019
    Permit 201911157426 $$$ $235,000

    Interior tenant improvement for a new bar and lounge. the space will be limited to include a new prep area and bar. no exterior work. mep, fire alarm and sprinkler under separate permit.

  24. Sep 2021
    Permit 202109168568 $$$ $100,000

    Basement-2nd floors: non structural tenant improvement including partitions, lighting and added security door. deferred mep.

  25. Sep 2021
    Permit 202109168569 $$$ $100,000

    6th fl: non-structural t.i. consiting of partition alterations, lighting anfd security doors, deffered mep.

  26. Oct 2021
    Permit 202110120313 $$$ $50,000

    Basement - 2nd floor: mechanical and electrical work for permit application 202109168568.

  27. Oct 2021
    Permit 202110150563 $$$ $45,000

    T.i. on 3rd floor consists of installing approx. 40 lineal feet of parttiions. remove clerestory window at interior stairwell on 5th floor and infill with 1 hour rated wall to match existing. defer mep.

DBI holds 61 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 61. 9 of them are nominal $1 street-space or sidewalk permits.