1909
Built as the Hearst Building.
-
1910
Built as a commercial building, recorded under the name Dave's.
-
Jul 1984
Parapet strengthing.
-
Jun 1993
Tenant improv gr fl for "salad bar" type restaurant.
-
Nov 1996
Renovate banquet room on basemnt level, h.c. complies.
-
Jun 1998
Fire pump added for fire sprinkler system as required.
-
Feb 2000
Upgrade fire sprinkler, main and branche.
-
Jul 2000
New fire alarm system.
-
Dec 2000
Renew permit app#9820280 to complete bathroom remodel.
-
Oct 2001
Install interior partitions for new fire control in basement, cross corriodor shaft (false beam) o.
-
May 2002
Renew permit application 9925540-to complete work 30% of work to be completed of -need to tie-in, fire sprinkler upg.
-
Feb 2003
Installation of exterior building maintenance window washing, equipment support davits at roof & ext.
-
Apr 2003
Fire sprinkler system on 1st floor.
-
Jul 2003
Installation of new fire alarm system-high rise package.
-
Jun 2004
T.i.to include new ceiling, lights, floor, finish new non bearing interior partition & fixtures hvac.
-
Jul 2004
Alternations to basement level tenant access. alterations are access related. provide new accessible.
-
Aug 2004
Tenant improvement: fire sprinkler relocation of existing heads to add heads to accommodate new hard lid.
-
Aug 2004
Remove three existing awnings to be replaced by two new awnings.
-
Aug 2004
Revision to 200407269798 remove and replace aging storefront at ground floor. portion to be replace.
-
Nov 2005
Interior t.i. for newsandwich shop, including newpartitions, fixtures, finishes, equipment. new lighting.no change to existing mechanical signage & fire protection under seperate permit.
-
Dec 2005
New coffee house including counter cabinets bathrooms, mechanical, electrical, ref pa no 200509263844.
-
2008
Recorded in the city's 2008 survey of the Transit Center District, adopted in 2012, as a contributor to the proposed New Montgomery, Mission & Second Historic District.
-
May 2012
9th floor - construction of full height furniture partitions to create 1 conf room, & 8 offices. mechanical, electrical, life safety, & sprinkler modifications are not under this permit.
-
Jun 2016
Remove, modify existing walls, doors, equipment, finishes, lights, plumbing fixtures. new/relocate equipment, fixture, lights plmg fixtures, finishes, lights, and wall. mechanical duct will be modified and new extension. n/a for maher.
-
Nov 2019
Change of use and occupancy from office to hotel inclusive with guest rooms & amenities, including restaurant/bar @ ground floor, lobby, retail shop, fitness center, event/meeting space(s), offices & a rooftop lounge/restaurant/bar type 3b over 1a construction 135 hotel guest rooms.
-
Jul 2022
Soft demolition & remediation on 6th fl. full accessibility compliance will be filed under separate tenant improvement permit per sfbc ab-017.
-
Mar 2026
Soft demolition in preparation for future renovation and seismic upgrade per ab 017.
DBI holds 93 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 93. 8 of them are nominal $1 street-space or sidewalk permits.