681–685 Market Street
East Cut · San Francisco, CA 94105
-
1906
Built as the Monadnock Building.
-
April 18, 1906
Its shell was among the handful in the district left standing after the April 1906 earthquake and fire.
-
May 1984
Demolition & installing new stairway.
-
May 1984
Exterior facade renovation on the 1st & 2nd floors.
-
Nov 1999
Oti-1 7th floor el, me, l/s, sp.
-
2008
Recorded in the city's 2008 survey of the Transit Center District, adopted in 2012, as a contributor to the proposed New Montgomery, Mission & Second Historic District.
-
Sep 2010
7th fl, interior tenant improvement including installation of partitions, ceiling, flooring, mechanical, electrical & plumbing.
-
Dec 2010
6th floor - installations of interior partition, doors, suspended ceiling, flooring, furniture, add addition toilet rooms.
-
Apr 2014
Consist exterior facade maintenance & repair incl removal existing paint, brick masonry repair & restoration, structural steel repair, terra cotta repair & restoration, sheet metal repair & restoration, flashing & water proofing, gfrc repair, new paint. ** maher ordinance# 155-13 not applicable **.
-
Nov 2014
3rd floor: tenant improvement consisting of new partitions, finishes & mep; sprinklers, fire alarm, separate permits. maher n/a.
-
Dec 2014
Project consists of removal of canopies & storefronts & replacement with new storefronts. n/a for maher ordinance.
-
Jul 2015
4th floor - tenant improvement to build new partitions, doors, break room, ceiling, millwork & finishes & mep. life safety & sprinklers on separate permit. n/a maher ordinance. a.k.a. 861 market street.
-
Sep 2016
Ti suite 220 existing finishes to remain. suite 290: demolition finishes & partitions. new partitions, door/frames, sidelights, finishes, ceiling system/devices light fixtures and electrical.
-
Jan 2020
Interior ti to existing 5th fl office space, kitchen area, & collaboration and conference spaces. no change of use; replace restroom finishes and accessories. mep deferred.
-
Jul 2020
Mep scope for interior improvement to existing 5th floor office space, kitchen areas and collaboration and conferences spaces (building permit #2020-0128-2872). no change of use, replace restroom finishes and accessories.
-
Sep 2021
T.i. of the existing space on the ground floor of 685 market. this consists of nw mep systems and finishes for 2 nw bars & a liquor store. nw wood flooring, wall paneling, ceilings, metal hand rails, millwork concrete infill & new restauarant.
-
Aug 2022
Lobby - modification of existing ground fl lobby, elevator lobby, corridor, and includes new millwork, new light fixtures, new guard desk, stone floor, and remedial accessibility work in restrooms.
-
Jan 2025
10th floor: ref demolition permit application 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.
-
Jan 2025
9th floor: ref demolition permit application 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.
-
Jan 2025
8th floor: ref demolition permit application 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.
-
Feb 2025
10/f: mechanical & electrical for pa-202501138215.
-
Mar 2025
8th /f: mechanical & electrical ref to t.i. 202501138213.
-
Apr 2025
2/fl- ti to floor including addition of restroom, shower rooms, conference, library, alternate work areas and raised platform in all hands area.
-
Jun 2025
1st/f: t.i. non structural partitions, finishes, & raised platform. work includes new 21" platform to courtyard & modifications to existing railing for new finishes at annie st. enttrance.
-
Jun 2025
2nd fl deferred mep for permit application 2025-0410-4123.
-
Jul 2025
7th floor: full t.i. in a 10 story hi-rise building. new non structural partitions, ceilings, and finishes. includues a breakroom/pantry. mep deferred.
-
Aug 2025
7/f: deffered mep to permit application 202507281741.
-
Feb 2026
4/f: full office t.i, new non-structural partitions, ceilings and finishes, employee break room/pantry.
DBI holds 507 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 507. 25 of them are nominal $1 street-space or sidewalk permits.
The inventory table in the same report dates this building to 1906, the year of the earthquake it describes the building as having survived. Not yet documented: the developer and the early tenants. Submit an update