33–53 Third Street
East Cut · San Francisco, CA 94105
-
1970
Built as Hearst Parking Center.
-
Apr 1986
To add an enclosed flower stand at the ground level.
-
Aug 1992
Fire sprinkler bsmt & sub bsmt.
-
Jun 1999
Vertical addition for parking garage.
-
Jun 2000
Erect: single faced, electric wall sign.
-
Jan 2001
Soft demolition to existing cookie store on g/floor.
-
Jan 2001
T.i. to existing store no change in use cosmetic altrtn 37, 500 costruct 20% hc for 7500 no up in wat.
-
Feb 2001
Install type -ii hood, duct & blower, make-up air unit for convection oven, under existingapp#200101260687.
-
Sep 2002
Reroofing.
-
Nov 2002
Remodel existing retail space on the 1st fl. partitions, lighting, electrical. 2 accessible restrooms & em.
-
Dec 2002
Installation of a fire alarm.
-
Feb 2003
Erect double faced electric wall projecting sign.
-
Feb 2003
Fire sprinkler installation, 66 sprinkler heads.
-
May 2003
Project includes the addition of a 205 sq ft reception area into an existinghallway & the addition of an.
-
Nov 2003
Renew appl#9910011 remaining work.
-
Jan 2005
Barrier removal @ 2 existingrestrooms, new fixtures, toilet, partitions, tile & light switches to be.
-
Apr 2006
Tenant improvement of an existing 6, 300 sq ft. multi restaurant space on street level with an existing 9 stories parking structure above to convert to california pizza kitchen restaurant. change in use - from s3/b/m to a-3/s3/m occ load calc ver.
-
Jun 2006
Remove suspended aloustic tile ceiling, non load bearing walls, counters, wall finishes, ductwork and flooring. remove sinks and refrigerators. soft demolition only. space to remain vacant until disability features requirement addressed under future applciation per admin. bulletin ab-017.
-
Aug 2006
Coring in concrete floor slab, storefront glazing demolition.
-
Oct 2006
Expansion of existing fire sprinkler system 84 new spinklrs.
-
Oct 2006
Erect single faced wall sign.
-
Oct 2006
Installa 5 awnings 8'x15'.
-
Jul 2011
Repair corroded post tensioning cables and strengthen a portion of concrete slab with carbon fiber reinforced polymers.
-
Nov 2012
New elevator recall control & supervisory system including. one elevator recall control & supervisory control unit. one remote annunciator; twelve smoke detectors; three relay modules.
-
Dec 2013
Voluntary structural upgrade @ 3rd street facade, addition of steel brace frames, planters & street trees. all work is exterior. compliance with ord no #155-13 not required. excavation <50 cu yd.
-
Apr 2017
Basement to 8/f- voluntary strengthening upgrade to correct short colulmn conditions at specific locations around the vehicle ramp, entrance and exit to garage. n/a ordinance #155-13.
DBI holds 50 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 50. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update