50 Third Street
South Of Market · San Francisco, CA 94103
Permit history
-
Dec 1980
New construction.
-
Nov 1982
Additions alterations or repairs.
-
Apr 1983
Misc.
-
Jan 1992
Alter lobby, 1st floor, sprinkler system 1st, 2nd & 3rd fls.
-
Feb 1993
Apply toyo coat.system to facades/add steel struct/flag pole.
-
Nov 2002
New corridor to garage/garage submitted under seperate app #200210310448.
-
Nov 2006
Add 19 tac panels, 420 smoke detectors, 78 detectors with sounder base, 11 single station detectors, 52 speakers, 20 speakers strobes and 457 strobes. work on all floors.
-
Jan 2007
Interior remodeling on floors 4, 35 and 36/: convert office space into 5 guest rooms construct new fittness center. 35 and 36th floor: interiro remodeling, removing interconnecting stair between floor 35 and 36.
-
Jan 2007
1st fl - renovations to lobby; lounge, restaurant, bar & port cochere. 3rd fl-renovation to meeting rooms, corridors and pre-function areas. exterior-modify marquere canopy, install decorative glass on facade over existing facade. replace existing marble with cement fiber panels, glass/alum storefront.
-
Mar 2007
1st floor: relocate 16 linear outlets and related ductwork, 3rd floor, relocate outlets and related ductwork, relocate vabs and tsats, add 1 ex fan for harvard meeting rm, add 5 smoke/fire dampers.
-
May 2007
Non-stuctural demolition of drywall partitions &finishes.new drywall partitions, new bar fixtures, finishes, new accessible restrooms(2), cabinetry for lobby bar.creating a new occupant load for bar in lobby. note: electrical, hvac, & plumbing on separate permits.
-
Dec 2012
Interior renovation of existing restaurant, bar & lobby lounge, accessibility upgrades at 1st fl restrooms, bsmt parking garage & exterior renovation of exterior patio & restaurant entrance. interior improvements include new partitions, flooring, lighting, booths, furniture & accessibility upgrades. electrical.
-
Apr 2013
Lobby - conension of existing lobby lounge to retail space, retail space build out under separate permit. replacement of existing revolving door & swing door with new vestibule, renovate existing luggage storage room, fire alarm & sprinklers under separate permit.
-
Feb 2014
Convert 1 conference room on 33/f & 2 suites on 36/f into 7 guest rooms. work includes new showers, plumbing fixtures, finishes, millwork, partitions. electrical, plumbing, mechanical as required to complete the project scope. work also includes infill an existing opening in 36/f structural slab.
-
Dec 2015
Tie back from shoring for 706 mission street.
-
Dec 2019
Conversion of e basement kitchen and liquor storage room to administrative offices. new exhaust fan on 4th fl roof with ass ductwork servinbv new offices. new lec and mechanical scope in e phone room. updates to main entry and accessible path to travel.
-
Mar 2020
Conversion of existing 3rd floor administrative offices to new fitness center & single occupancy all gender restroom. new mechanical, electrical & plumbing work associated with project scope.
-
Sep 2020
Conversion of existing 4th floor fitness center into 5 new hotel guestrooms. new mechanical, electrical, and plumbing work associated with project scope.
-
Nov 2020
Renovation to allexisting guestrooms+ guestroom corridors, work includes new finishes throughout, tub to shower convension modifications to electrical devices+modification to existing plumbing for fixture replacement.
-
Dec 2020
Lobby level renovation includes new finishes, replacement of lighting, modification to bar & buffet, revision to existing restaurant layout & existing giftshop layout. modify existing electrical, plumb, & hvac. 2nd & 3rd floor renovation: new finishes, replace light fixtures. no hvac.
-
May 2021
Ab-017 soft demolition non-structural. no ceiling, sprinkler or fire life safety scope. floors 4-36. no demolition in lobby.
-
Jun 2021
Ab-017 soft demolition nonstructural. sprinkler work to be design/build under separate permit#202106112272.
-
Aug 2021
Renovation to existing porte cochere including new finishes, lighting, partial infill of existing ceiling. sprinkler modifications to be design/build under separate permit. no hvac work.
-
Feb 2026
Cooling tower replacement.
DBI holds 115 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 115. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update