680–688 Mission Street
Financial District · San Francisco, CA 94105
-
Apr 1999
To erect apts retail parking & office space.
-
Aug 2000
Design and installation of standpipe and fire sprinkler system.
-
Mar 2001
Provide public spacet/i in basement waiting rm area main res'l lobby with support space 3/f management.
-
Sep 2001
Restaurant to be built on premises at 688 mission st accdg to plans submitted-no structural work.
-
2002
Built.
-
2002
Hotel Jessie façade reattached
The façade of the demolished Hotel Jessie was reattached to this building's Jessie Street elevation as a condition of the project.
-
Mar 2004
Ti new const in shell space wall, doors, plumb, casework ceiling, lighting spr. + electrical + hvac + ls.
-
Aug 2004
Tenant improvement for uc berkelley extension on lobby & 2nd floor only, mep & fire under seperated.
-
Oct 2004
Mechanical & electrical for u.c. berkeley extension tenant improvement in a highrise bldng, arch/str.
-
May 2006
New b-occupancy coffee cafe. 1st time tenant on ground floor of new building. work includes new partitions, fixtures, finishes, equipment. new lighting, plumbing & mechanical. no exterior work. fire protection under separate permit.
-
Apr 2008
Int. inprovements for a yogurt bar, new counter, equipment, walls & finishes, no structural & no exterior work, first tenant improvement.
-
Aug 2009
Construction of fully accessible restaurant in ground floor commercial space of existing mix-use residential/commercial building (high-rise).
-
Aug 2014
T.i. on 3rd & 4th floor office & pool areas. work includes new partitions, fixtures, finishes. mep & fire protection under separate permits.
-
Dec 2014
Mep associated with 201408042914 all other work unde sep permit(maher ordinance extended #155-13 not required).
-
Oct 2016
Lobby renovation in an existing high rise condominium building, new fixtures, finishes & elevator cab's finishes. n/a ordinance #155-13.
-
Dec 2016
Ti- portion of 3rd & 4th floor including: a) tie into existing bld systems for plumb, ele & hvac. b) construction of offices, storage space, meeting rooms, staff kitchenette. c) construct ada bathrooms. d) install ff&e ground floor entry & 3rd/4th floor offices maher na.
-
Oct 2017
G/f -ti of restaurant with non-structural walls, equipment, finishes with associated plumbing, electrical, & mechanical. maher na. new address assignment: 91 third street.
-
Feb 2018
Construction of a bona-fide restaurant in the location of an existing restaruant, replacing existing door, re-orientation of existing glazing.
-
May 2018
Five units: kitchen and bathroom remodel in kind. no walls added, moved or infilled. existing layout unchanged. all adaptable fixtures to be maintained. replace fixtures and finishes only.
-
Jun 2018
Five units: kitchen & bathroom remodel in-kind. no walls added. moved or infilled. existing layout to remain unchanged. all adaptable fixtures to be maintained. replace fixtures & finishes only.
-
Jun 2018
Five units. kitchen and bath remodel, in-kind. no walls moved, added on infilled. existing layout to remain unchanged. existing adaptable features to be maintained.
-
Mar 2019
Four units - kitchen and bath remodel in kind. no walls moved. floor plan unchanged. all existing adaptable features maintained. fire separation maintained between units. mep maintained.
-
Mar 2023
Three units: kitchen & bath remodel, 2 units, floor plan to remain unchanged. mep maintained. no alterations to windows & doors. no work outside unit, remodel in kind. no walls moved. no structural work.
-
Jun 2023
Four residential units: kitchen and bath remodel: floor plan to remain unchanged. mep maintained. no alterations to window's and doors, no work outside unit, no walls moved. no structural work. remodel in kind. accessibility per cbc chapter 11a to be maintained.
-
Sep 2023
Three units: 1 kitchen and 1 bathroom remodel in each unit. no walls moved. floor plan to remain unchanged. fire seperation btw unit's and mep maintained. no door/ window alteration. no work outside unit's.
-
Sep 2025
Th intent of this project is a "voluntary" replacement of the existing, currently functioning, alarm control unit (facu) at the request of owner.
DBI holds 230 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 230. 4 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 678 Mission Street Same street
- 701–783 Mission Street Same street
- 163–165 Jessie Street Same block
- 658–664 Mission Street Same block
- 652–654 Mission Street Same block
- 33–53 Third Street Same block
- 50 Third Street Around the corner
- 142 Minna Street Around the corner