658–664 Mission Street
East Cut · San Francisco, CA 94105
-
1906
Built as the Textile Building.
-
September 14, 1950
The Office of the Assessor-Recorder photographed the property for tax assessment.
-
Nov 1986
Parapet bracing & roofing work as per plans.
-
Mar 1989
Reroofing.
-
Oct 1989
E.w.o.
-
Sep 1990
Remove existing canvas canopy awning to install a new canvas.
-
Aug 1993
Reroofing.
-
Aug 1993
Resheet roof with 5/8 cdx plywood.
-
Jun 1996
Comply umb ordinance. general procedure.
-
Mar 1999
Remodel of existing restaurant dining rmexistingkitchen hood to remain.
-
Apr 1999
Remodel storefront per plans.
-
Apr 2000
Removal of carpet/2 layers linollium/refinish floors.
-
May 2003
Interior soft demolition of existingrestaurant on grnd floor; no structural work in advance of ti for new rest.
-
Jun 2003
T.i. for ground floor restaurant interior work only no struct. work.
-
Aug 2003
Revision to previous submittal. glass finished entry floor w structural calculations. revision to.
-
Oct 2007
Reroofing.
-
Nov 2007
Demolition of interior partitions of office space only. soft demolition work only.
-
Dec 2007
Renovation of an existing "b" occupancy to provide new toilet rooms - including one accessible stall, new storage room, new sink & counter at coffee area, and new ada compliant entry doors.
-
2008
Recorded in the city's 2008 survey of the Transit Center District, adopted in 2012, as a contributor to the proposed New Montgomery, Mission & Second Historic District.
-
Nov 2010
Strengthening 4 steel beams under sidewalk, remove concrete topping over sidewalk, water proofing & pour new concrete topping over sidewalk.
-
Sep 2011
Remodel & restoration of existing exterior facade including new windows, new entry doors, new signage (with electrical. work) & exterior painting.
-
Sep 2011
Erect electric projecting double faced sign.
-
Jan 2012
Interior remodel of existing nightclub including electrical & plumbing work. existing ceiling to remain, existing ada complaint restrooms with new wall finishes. new bars, new banquette seating, new accessory kitchen and new restroom. new hallway & new flooring materials & bookcase.
-
Dec 2012
Install new fire sprinkler system at basement & 1st floor louge. including underground. 105 heads total. ref permit application 201201273097.
-
Jan 2013
Upgrade of existing mechanical & plumbing systems: rerouting/addition of ducts, air distributors, water supply, piping, drains (floor & floor sinks), vents.
-
Jan 2013
Install a system to monitior fire sprinkler. ref fire sprinkler app# 2012.12.13.6111.
-
Dec 2023
Remove existing unused sidewalk steel access hatch & filling opening with concrete. upgrade existing stell beams & post supports in the basement below sidewalk.
DBI holds 36 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 36. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update