655–671 Mission Street
East Cut · San Francisco, CA 94105
-
1907
Built as the McLaughlin Building.
-
1909
Built as the Grant Building.
-
Feb 1982
Building use: offices.
-
Apr 1982
Additions alterations or repairs.
-
Jul 1984
Tenant improvement to a vacant 2/f of an exist. office building.
-
Apr 1993
Seismic reinforce entire building/new stairs/elevator/toilet rm.
-
Jun 2000
Street space use.
-
Sep 2001
Oti-1 3/f el me ls sp.
-
Dec 2017
Voluntary seismic upgrade to existing building on all floors per 403, ab-017. maher ordinance comply.
-
Dec 2017
Voluntary seismic upgrade to existing building on all floors per 403, ab-017. maher ordinance comply. maher ordinance comply.
-
Dec 2017
Soft demolition of interior partitions, doors, frames, hardware, floor, wall finishes. existing elevator shafts/lobbies, stairs, fire enclosures to remain. no exterior work ab017; n/a maher.
-
Dec 2017
Remove e interior partitions, doors, frames, hardware floor, wall finishes. e elevator shft lobbies, stairs, fire enclosures to remain. no exterior work. ab017. n/a maher.
-
Feb 2018
Merge lots and merge 2 adjacent buildings into a single parcel. 657 mission is type 1b & 667 mission is type 3b. improvements will include new cores with egress stairs & restrooms, newstorefronts, roof deck, 3 hours horizontal exits between buildings & mep systems. ** maher: n/a **.
-
Aug 2018
Deferred micro pile submittal for seismic upgrade. ref permit application 201712227263 and 201804206969.
-
Sep 2018
Installation of pg & e transformer vault on mission street.
-
Jan 2019
Install new u6 6" fire service, new fire pump & backflow, new fdc & standpipe system. sprinkler protection througout. add 1422 hds. ref permit application #2018/0227/2374. **maher n/a**.
-
Jan 2019
Instal new 6" fire service, new fire pump & backflow, new fdc & standpipe sytem. sprinkler protection throghout. ref permit application #2018/0227/2374.**maher n/a**.
-
Mar 2019
Installation of new fire alarm system in renovated core & shell building. ref permit application 2018-0227-2374.
-
Mar 2019
Revision to 201802272374, revise toilets rooms on level 1-6 to a gender.
-
Jun 2026
Tenant improvement on the 5th fl to include interior demolition and construction of new partitions, millwork, ceiling. drywall coverage at windows overlooking 667 mission. mep, life safety, and fire sprinkler under sep permit.
-
Jun 2026
Tenant improvemen on the 6th fl to include interior demolition of drinig fountain guards and storm drain riser. construction of new partition millwork and ceiong. mep under sep.
-
Jun 2026
New interconnecting stair between level 4-6.
-
Jun 2026
4/f: tenant improvement to include interior demolition and construction of new partitions millwork and ceiling. mep, life safety and fire sprinkler under seperate permit.
-
Jun 2026
4/f: tenant improvement to include interior demolition and construction of new partitions millwork and ceiling. mep, life safety and fire sprinkler under seperate permit.
-
Jun 2026
Basement level: interior demolition and construction to create new mailroom and mpoe at basement. new lobby and relocation of trash room at 1st floor. mep under separate permit.
-
Jul 2026
Mechanical & electrical work for tenant improvement on the 6th fl. ref arch 202606223622.
-
Aug 2026
Mechanical and electrical work for tenant improvement on the 5th floor. ref#: 202606223612.
DBI holds 183 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 183. 18 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update