100–126 New Montgomery Street
East Cut · San Francisco, CA 94105
-
1902
Built to plans by Meyer & O'Brien.
-
1910
Repaired rather than replaced after the 1906 fire gutted it, and back in service by 1910.
-
May 1983
Sign - erect.
-
Apr 2001
Correct address from 90 new montgomery to 116 new montgomery (ref)200007296462.
-
2008
Recorded in the city's 2008 survey of the Transit Center District, adopted in 2012, as a contributor to the proposed New Montgomery, Mission & Second Historic District.
-
Oct 2008
Ground floor: new elevator cab interiors, refurbish marble floor, add missing door. 2nd fl: demolition non structural walls, ceiling tiels, light fixtures. new fire rated walls, new fire rated doors, suspenced ceiling and lighting. new hi lo drinking fountain. mep sep permit.
-
Aug 2010
Interior tenant improvement to existing offices. demolition of partitions ceililng grid and select lighting.new interior partition, lighting power, paint and carpet. mechanical, electrical, & plumbing on seperate permit.
-
Oct 2010
5th floor-t.i. includes demolition of non-structural partitions & build, new non-structural partitions. all new or revised hvac, electrical, lighting, plumbing & life safety work will be design build & submitted for permit seperately. building is partially sprinklered.
-
Dec 2011
New sales area checkout and merchandising fixtures. new reach in freezer and cooler cases. expand pharmacy and upgrade fixtures and equipment. reconfigure restrooms and surrounding areas to meet accessibility requirements. new condenser on roof.
-
Jul 2013
7th floor t.i. to include selective demolition & construction of non-load bearing partitions, demolitoin of ceiling grid+tile to concrete slab above, new light fixtures including re-switching, new int doors, glazing+ frames, salvage+ reuse of existing selected materials, new electrical, millwork + finishes.
-
Jul 2013
2nd floor t.i. to include selective demolition & construction of non-load bearing partitions, demolitoin of ceiling grid+tile to concrete slab above, new light fixtures including re-switching, new int doors, glazing+ frames, galvage+ reuse of existing selected materials, new electrical, millwork + finishes.
-
Dec 2013
1st, 2nd, 7th fl. non-structural demolition, new non-structural partitions, doors, frames & hardware, new lighting & acoustical ceiling & new finishes. recognized historical building.
-
Mar 2014
8th floor: non structural demolition new non-structural partitions, doors, ceiling, lighting, finishes, no change of occupancy use or area. n/a for the maher ordinanace and n/a for the interim control #428-13.
-
Jun 2014
Office tenant improvement on the 7th floor. to include mep and title 24. no structural work. life safety and fire sprinklers under separate permit.
-
Jun 2014
Ste200 2/f modification existing ti to include selective demolition & construction of non-load bearing partitions, demolition of ceiling grid & tile to the concrete slab above, new light fixtures incl reswitching, new interior doors, glazing & frames, salvage & reuse of, add ramp in terrace.
-
Aug 2014
Basement level - partial remodel of existing basement space to provide for bike storage & one unisex shower room.
-
Nov 2014
Remodel of existing 9th floor lobby & restrooms. installation of an amenity & private roof deck, including access stairs and ramps. deferred: alarm upgrade; sprinkler system modification to sprinkled the entire 9th floor(design building); removal of existing class 2 standpipe hose cabinet(design building) n/a maher.
-
Jan 2015
4 fl: modifiction of existing t.i. to include selective demolition & construction of non-loadbearing partitions, demolition of ceiling grid & tile to conc slab above, nw light fixtures include reswitching, nw interior drs, glazing & frames, reuse of existing materials if practical, nw electrical., nw millwks, nw finishes.
-
Jan 2015
3rd floor: modification of existing t.i. to include selective demolition & construction of non-load bearing partitions, demolition of ceiling grid & tile to concrete slab above, new light fixtures, interior doors, glazing&frames, salvage/reuse of existing materials if practicable, new electrical, millwork & finishes; maher n/a.
-
Jan 2015
New accessible restrooms and renovation of existing elevator lobbies to include slelective demolition and construction of non load bearing paritions, demolition of ceiling grid tile to concrete slab abvove new light fixtures, new interior doors and frames, reuse of e materials where practical, new electrical, new.
-
May 2015
Modification of existing tenant improvement to include selective demolition and construction of non load bearing partitions, ddemo of e ceiling grid and tile, new light fixtures including reswitching, new interior doors, glazing, frames, new electrical, n millwork, finishes. restroom upgrade work prformed.
-
Nov 2021
G/f: replacement of existing non-original storefronts along mission str and the three northernmost storefronts along new montgomery st. no removal of original fabric modification of interior vestible. no mep work on this permit.
-
Dec 2021
T.i.constisting of specific suite build-outs for future ground floor retail. new restrooms @ ground floor. mep & elevator deferred. no work at historical facade.
-
Aug 2022
2/f: interior t.i: consisting of open work space and meeting rooms. new non-structural partitions, doors, ceilings, finishes, and millworks. mep deferred.
-
Nov 2022
8/f: ti to return space to single tenant work includes: install non-bearing interior partitions, new interior storefront systems, cinference & phone rooms, new single user restroom, new casework, new mep.
-
Dec 2022
5th fl non structural partions, new all gender restroom, casework, fixtures and finishes.
-
Jun 2023
2/f: mep drawings for permit. these are the engineered plan that are associated with permit application 202212168572 & 202306150173.
-
May 2025
2nd fl ti - new non-structural partitions, interior storefront systems, lighting, electrical, plumbing. pantry upgrades. mep deferred.
DBI holds 316 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 316. 10 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. The 2008 survey of this district dates the building to 1902; the assessor dates the building on this parcel to 1901. The report gives this building's address as 100 New Montgomery Street in its inventory table and 116 New Montgomery Street in its narrative, and its date as 1901 in the table and 1902 in the narrative. Submit an update