Permit history
-
Feb 1982
New construction.
-
Jun 1986
Tenant improvement.
-
Aug 1986
Installation of ceiling hvac & lights on 15th floor.
-
Jan 1988
Tenant buildout for office space @ 5th floor.
-
May 1988
15th floor tenant buildout.
-
Jul 2000
Retail space tenant build out 1st floor and basement.
-
Oct 2003
Oti-1 5th floor el me ls sp.
-
Jul 2007
13th floor-office tenant improvement: renovating existing office space on the for tenant. mechanical and electrical work to be submitted under separate permit.
-
Oct 2007
T/i suite 230, new server room, 2 conference rooms, doors, open office space.
-
Mar 2008
7th floor: tenant improvement including non-structural demolition and partition build back. (electrical, mechanical lifesafety and sprinkler to be permitted under separate permit.) building fully sprinklered.
-
Aug 2012
New tenant improvement work including electrical, mechanical, plumbing, install new merchandise equipment, new finishes (floor, ceiling, wall panels), install coffee bar, beverage counter, & new restrooms, sink. f/a and sprinklers on separate permit.
-
Jan 2013
3rd floor-ti includes demolition of non structural partitions & building new non-structural partitions. all new or revised hvac, electrical, plumbing, life safety work will be design build & submitted for permit seperately. building fully sprinklered.
-
Jan 2013
15th floor: t.i. including the demolishing of non structural partitions and building new non-structural partitions. all new or revised hvac, electrical, plumbing, and life safety work will be design-build and submitted for permit separately.
-
Aug 2016
Ground fl: interior tenant improvement remodel of existing coffee shop. remodel includes front counter line and back of house. new unisex restroom added. alarm/sprinkler deferred. maher not req.
-
May 2017
2/f #250- t.i. for an office space in an existing multi story office building. scope includes new gypsum board walls, millwork, minor electrical, plumbing & hvac, paint & finishes. n/a ordinance #155-13.
-
Sep 2017
5th fl - ti includes the demolition of non structural partitions and installing new power/data outlets. all new or revised mep, life safety/srpinklers will be design build and submitted for permit separately (building full sprinklered) new rest room work.
-
Oct 2017
Suite 500: title 24 for mechanical & electrical for pa 2017-0918-8881. maher n/a.
-
Apr 2018
14th fl suite 1450: ti demolition non structural partiton, and installation new non structural partitions etc, all new or revised meps, life safety and sprinklers submitted separately.
-
May 2018
Replace existingfire alarm control unit with new est3 unit, &addressable devices with new est siga addressable devices. existingaddressable circuits tied into new est3 cards.allexistingwires shall remain &revised.allexistingnotification appliances to remain&no new speakers or visual appliance are inclued.maher n/a.
-
Jul 2018
15th fl, ste 1500 ti inlcudes, demolition of non structural partitions and install new non structural partitions. all new or revised hvac, electrical, plumbing life safety, sprinklers under separate permits (building is fully sprinklered). maher n/a.
-
Sep 2018
13th floor, ste. 1301: interior only t.i. demolition of non-bearing walls and ceiling. new construction of walls, doors, ceiling and finishes. n/a for maher.
-
Jul 2019
11th floor: t.i. includes of non structural partitions and building new nonstructural partitions. mep's, life safety and sprinklers under seperate permit. building fully sprinklered. n/a for maher.
-
Oct 2019
11/f: demolition existing duct & hvac equipment as shown on m20. install new duct/hvac equipment as shown on m2.1. no new fire smoke dampers. provide lighting ti of approx 6, 891 sq ft. office space. ref permit application 201907155848 for architectural.
-
Dec 2021
Ste 250. new carpet & ceiling grid, relocating heat pump and add new grills. relocate lights and add new occupancy sensors. demolition of partition wall.
DBI holds 224 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 224. 7 of them are nominal $1 street-space or sidewalk permits.