1908
Built as the Crellin Building.
-
Jul 1990
Remove concrete basement flooring, interior partitions.
-
Jul 1990
Install structural piles at existing footings per structural drwg.
-
Aug 1990
Install structural foundation slab, pile caps, structural sh.
-
Aug 1990
Install shotcrete overlays to existing unreinforced masonry walls.
-
Jan 1991
Final application - see #9014400, 9015474 & 9016431.
-
Apr 1994
Sprinkler piping in basement.
-
Nov 1994
Ground floor exterior improvement and lobbies rev.# 9404555.
-
Dec 1994
Cti i 4th floor el-me-sp.
-
Dec 1994
Cti i 3rd floor el-me-sp.
-
Dec 1994
Cti i 2nd floor el-me-sp.
-
Dec 1994
Cti i ground floor-el-me-sp.
-
Jan 1995
Cti2 3rd floor el me sp.
-
Jan 1995
Cti 2 2nd floor el me sp.
-
Jan 1995
Cti 2 grnd floor el me sp.
-
Jan 1995
Cti 2 4th floor el me sp.
-
Sep 1997
Cti 2 el me ls sp 5th floor.
-
Sep 1997
Ct1-2 me, el, & plumbing engineered plans (5th floor).
-
May 2006
Oti-1 6th floor el, me, l/s, sp.
-
Jun 2007
Oti-1, 5th floor, existing walls demolition new partitions. upgrade restrooms, drinking fountain signage. electrical and mechanical on separate permit.
-
Aug 2007
New electrical outlets & lighting. no exterior work- see approved 2007-0626-5114 for reference.
-
2008
Recorded in the city's 2008 survey of the Transit Center District, adopted in 2012, as a contributor to the proposed New Montgomery, Mission & Second Historic District.
-
Feb 2014
Change of use from b to a-2 in existing restaunt space due to increase in seating. remodel of the kitchen & dining area, no exterior work to be done, compliance with ordinance 155-13 not required. occupant verification required.
-
May 2018
Remove & replace 130 ton cooling only ac unit.
-
Dec 2019
2nd & 3rd fl - renovation of existing office space & existing server room for the dept. of child support services. maher na.
-
Jun 2026
Interior tenant improvement for converstion of e coffee shop to a cocktail lounge w limited food preparation. scope includes interior demolition, construction of bar and service area, new bathrooms, new finishes, m, illwork, lighting. electrical, plumbing. no chantes to building envelope.
DBI holds 63 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 63. 1 of them are nominal $1 street-space or sidewalk permits.