601–609 Mission Street
East Cut · San Francisco, CA 94105
-
1907
Built as the Stevenson Building.
-
Apr 1982
Additions alterations or repairs.
-
Aug 1984
Interi. remodel for 2900 s.f. restaurant within tenant space.
-
May 1985
Increase office space.
-
Aug 1994
Comply with umb ordinance.
-
Oct 1996
Ground floor facade remodel one new accessible elevator.
-
Dec 1996
Tenant improvement on 5th floor.
-
Feb 1997
Interior office tenant improvement.
-
Mar 1997
Cti-1 el me 2nd floor.
-
May 1997
Int tenant improv 3rd fl/instal a rated corridor/offic spac.
-
Jun 1999
Demolition restaurant & build copy store "pro copy".
-
Jul 1999
Demolition interior & create retail sales area.
-
Mar 2000
Remove existing stair and replace with new const. renovate existing toilets.
-
May 2001
Oti-1 5th floor el, me, sp.
-
Sep 2001
Oti-2, 5th floor ltg, mechanical.
-
Jul 2003
Oti-1 2nd floor. el.
-
Jun 2004
Oti-1, 2nd/ fl-el, me, ls.
-
Nov 2007
4th floor: open office reconfiguration- 2 tnant space to a single tenant. open office furniture reconfiguration: partition demolition, add enclosed office.
-
2008
Recorded in the city's 2008 survey of the Transit Center District, adopted in 2012, as a contributor to the proposed New Montgomery, Mission & Second Historic District.
-
Feb 2011
Tenant improvement to 6th fl of 118 second st/609 mission st. construction of interior partition walls for private and open offices. new outlets, lighting. relocation of existing ducts and registers as req for new offices.
-
Nov 2013
Interior non-structural demolition on ground floor & basement ab-017. no construction work.
-
Nov 2013
T.i. for new retail pharmacy on ground floor & basement work includes new fixtures, bathrooms, mep & non-passenger vertical lift. no exterior work, fire protection under separate permit.
-
Nov 2013
Facade work only for new cvs pharmacy. scope is to replace 1 window with new door on 2nd street & relocate 1 set of doors on mission street & replace 2 others with windows. all work on street level. no other work. t.i. under separate permit.
-
Aug 2015
Installation of new voluntary fire alarm system. ref permit application 2013.1122.2669.
-
Jan 2016
Shelving only for cvs drugstore. t.i. approved under app#201311222669.
-
Apr 2018
New traffic signal pole foundation in subsidewalk basement.
-
Sep 2018
Reroofing.
DBI holds 77 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 77. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. Submit an update