611–615 Mission Street
East Cut · San Francisco, CA 94105
-
1907
Built as the Koret Building.
-
May 1982
Additions alterations or repairs.
-
Jul 1982
Additions alterations or repairs.
-
Jul 1982
Building use: office.
-
Jun 1992
New office partions paint & patch n/electrical for n/parti.
-
Feb 1999
Seismic strengthen sec. 104f; 3 new shear walls.
-
Mar 1999
Interior demolition all walls, floors 1-7 and basement.
-
Apr 1999
Base buildng upgrades-new hc access elevator, restrms.
-
May 1999
Build new partitions for office/standard ti space.
-
Jun 1999
Fire protection.
-
Jul 1999
Oti-1 electrical, mechanical, life safety, sprinkler, 3rd fl.
-
Jul 1999
Oti-1 electrical, mechanical, life safety, sprinkler, 4th fl.
-
Sep 1999
Oti-1 7th floor, el. me. sp.
-
Sep 1999
Oti-1 6th floor, el. me. sp.
-
Sep 1999
Oti-1 5th floor, el. me. sp.
-
Sep 1999
Oti-2 3rd floor el me.
-
Sep 1999
Oti-2 4th floor el me.
-
Sep 1999
Oti-2 5th floor el me sp.
-
Sep 1999
Oti-2 6th fl, el, me.
-
Sep 1999
Oit-2 7thfl, el, me.
-
Nov 1999
To erect single faced non electric sign.
-
Nov 1999
Fabrick & install 1 triangular style awning.
-
2008
Recorded in the city's 2008 survey of the Transit Center District, adopted in 2012, as a contributor to the proposed New Montgomery, Mission & Second Historic District.
-
May 2015
5/f -t.i. on a 7 story building. buil-out consists of demolition of existing partitions and construction of new wall and glazing configuration, minor power data work and finishes. no new ceiling or lighting. no structural work to be performed.
-
Jun 2015
5th floor: fire sprinkler only. add one upright head off of new conference wall. fire spec suite 500. ref app#201505297480.
-
Aug 2017
To erect an electric, single faced wall sign.
3 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early tenants. Submit an update