101 Second Street
East Cut · San Francisco, CA 94105
Public art
- Sumer #24 — Larry Bell
Bronze; indoor park; artwork is available from 8 am - 6 pm.
Larry Bell, born in 1939 in Chicago and associated with the Light and Space movement, cast Sumer #24 in bronze as part of a series referencing the ancient civilization of Sumer. - Core — Charles Arnoldi
Canvas, acrylic; indoor park; artwork is available from 8 am - 6 pm.
Charles Arnoldi, an American painter, sculptor and printmaker, was born in 1946 in Dayton, Ohio, and had his first solo exhibition at Los Angeles's Riko Mizuno Gallery in 1971.
-
May 31, 1951
The Office of the Assessor-Recorder photographed the property for tax assessment.
-
Aug 1985
New construction.
-
Mar 1990
Erect a 32 story office/retail/parking structure.
-
Feb 1998
Alter site app #9004040s reduce # of stories 32 to 26.
-
Jan 1999
Ti for 2-3/f 16-21/f wall door window system fixture.
-
Mar 1999
One stop: tenant improvement, dry wall, doors, frames, etc.
-
May 1999
One stop: t.i. int.(non-load bearing)drywall, doors, frames.
-
Aug 2008
Office tenant improvement to 11th floor of 25 story, full sprinklered office building. approx 14000 sq ft ti includes new carpet, new non load bearing partitions, new millwork, new kitchen area, new workstations, and new doors. mep separate permit.
-
Dec 2010
Office ti on 7th floor. demolition of existing non struc partitions, lighting, power/data, electrical, millwork and finishes thruouit. ne wnon struc partitions, lighting, power/data, electrical, millwork and finishes. no change in occup, no increase of footprint.
-
Sep 2011
Demolition of existing non structural partitions, lighting, power/data, electrical, millwork, finishes throughout. new non structural partitions, lighting, power/data, electrical, millwork, finishes. no change in occupancy or use. no increase in footprint.
-
Oct 2011
Tentant improvement on 24th and 25th fl including demolition of non structural partitions. construction of non structural partitions. removal of existing acoutsitcal ceilings and gyp board ceilings, new electrical and lighting, niew finishes throughout. mechanical, electrical, plumbing. life safety, sprinklers, evac signs.
-
May 2014
4 fl- addition of (2) meeting rooms. new lighting fixtures in same meeting & addit'l teledata outlets. updated finishes. no change in ocupancy/use. no change in footprint. mep in same permit. lifesafety under seperate permit. n/a ordinance #155-13.
-
Mar 2016
15/f- t. i. to construct new partitions, doors, finishes, ceilings & millwork. mep, fire protection and life safety to follow under seperate permit. n/a ordinance #155-13.
-
Mar 2016
11th floor t.i. & renovations on the vacant, non-occupied which include demolition non-structural partitions, millwork, doors, ceiling, lighting, electrical, finishes & construct non-structural partitions, doors glazing, ceiling, light fixtures, millwork & finishes. mep under same permit. l/s under separate bpa.
-
Apr 2017
Construction of new tentant layout, construction of partitoins, doors, ceilings, millwork, and plumbing fixtures. demolition under 201704133933 mep included.
-
Nov 2019
New non-structural partitons office front glazing system, accustical grid & tile & gyp board ceilings, light fixutes, millwork, restroom finishes, partion fixtures includes mep on the 19th fl. no changes to use exit stairs, egress path, elevator fire sprinkler & life safety.
-
Nov 2019
6th floor ti: new construction includes interior partitions, ceilings, mep, casework.
-
Jan 2021
Suite 200 - t.i. modification include selective demolition & contruction of non-load partitions, new doors, frames, new ceiling grid, light fixture, millwork & finish.
-
May 2022
23rd fl: office tenant improvement to include selective demolition, construction of employee breakroom/pantry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.
-
May 2022
24th fl: office tenant improvement to include selective demolition, construction of employee breakroom / panyry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.
-
May 2022
22nd fl: full floor t.i. structural work at new skyfold partitions. add 2 new fsd's.
-
May 2023
25 floor: office tenant improvement for approximately 12000 sq ft of the 25th floor, including 2 new new gender neutral restrooms.
-
Jul 2023
10th floor: interior t.i of existing office space. consist of non structural partitons, office front glazing system, restroom finishes, mep systems.
-
Mar 2024
5th fl tenant improvement. mep defferred.
-
Oct 2024
3rd fl ti: construction of non load bearing partitions. modification of existing ceiling grid & tile, new light fixtures & relocation. new office doors & frames, millwork, finishes & sinks. life safety sep permits. mep deferred. ref demolition permit 202410152909.
DBI holds 470 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 470. 1 of them are nominal $1 street-space or sidewalk permits.
The assessor dates the building to 2000, after this photograph was taken. Not yet documented: the developer, the early tenants and when each artwork was installed. Submit an update