785 Market Street
South Of Market · San Francisco, CA 94103
-
Oct 1981
Additions alterations or repairs.
-
Nov 1982
Building use: office.
-
Apr 1983
Additions alterations or repairs.
-
Dec 1983
Install steam to hot water heat.
-
Apr 1984
Install new partitions, doors, suspended acoustical ceiling.
-
Jun 1984
Install new partitions suspended ceiling, & lighting.
-
Jul 1984
Install new partition, ceiling, lighting, power & phone outlets.
-
Jul 1984
Install new partitions interior windows, doors ceilings.
-
Nov 1984
Const.new partttions, ceiling, light, power & phone cutlets.
-
Apr 1999
Oti-1 14th fl.
-
Aug 2010
Ground floor tenant improvement for men's wearhouse. new interior finishes & m.e.p. fire alarm & sprinkler under seperate permit.
-
Aug 2010
Remodel of existing historic lobby on grond floor.
-
Apr 2012
Interior improvements on 2nd fl. reconfigure non structural partitions, new mep distribution, new and relocated lighting. new and relocated door to hardware. upgrade toilet room.
-
Mar 2013
4th floor-inter ti-conversion of multi-tenant floor to single tenant. removal of rated corridor & associated rated doors. new interior non structural paritions, new m.e.p distrib., new & relocated lighting, relocated doors & hardware. new finishes. accessible plumbing upgrades as part of disable acc.
-
Apr 2013
Removal of existing ceiling height partitions doors and hardware. new interior non structural ceiling hght partions, new and relocated cieling grids, tiles and lighting, relocated doors and hardware, new finishes, etc. replacement of existing cabinetry and plmg & office coffee room.
-
Oct 2017
One for one fire alarm replacemernt project. provide new fire alarm system per pre-application meeting minutes dated 12/21/2016.
-
Mar 2019
13th floor only t.i. add 1 new partition existing stair and elevator lobby to remain as is patch & repair existing finishes.
-
Apr 2019
#1000: tenant improvement: demolition of non load bearning walls construction of new partition, doors, relocation of sink and new finishes.
-
Apr 2019
Suite 950: tenant improvement: demolition of non load bearning partitions construction of new partition, doors, relocation of sink and new finishes. maher n/a.
-
Apr 2019
8/f: suite 800 - demolition of non-load bearing partitinos, construction of new partitions, doors, frames, hardware; relocation of sink and addition of new finishes. maher n/a.
-
Jan 2020
5th fl; this project involves modification of existing t.i. to include selective demolition and construction of non load bearing partitions, new ceiling grid and tiles, new light fixture and new switching, new office doors and frames, and reuse of existing selected materials if practicable, millwork, new sink and.
-
Jan 2020
3rd fl; this project involves modification of existing t.i. to include selective demolition and construction of non load bearing partitions, new ceiling grid and tiles, new light fixture and new switching, new office doors and frames, new millwork, new sink and new finishes.
-
Jan 2020
4th fl; this project involves modification of existing t.i. to include selective demolition and construction of non load bearing partitions, new ceiling grid and tiles, new light fixture and new switching, new office doors and frames, saluage and refuse of selective materials if practicable, new millwork.
-
Nov 2020
5th fl: deferred electrical for permit application 202001222479. title 24.
-
August 25, 2026
Day Around the Bay: 95-Foot Illuminated Installation Launches on Market Street — SFist
DBI holds 162 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 162. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update