1872
The new St. Patrick's church was dedicated, serving a predominantly Irish immigrant population of about 30,000 and intended as the Irish national church of San Francisco and the West Coast. The parish had been established in 1851 in a rented hall at 4th and Jessie streets, and its lot on the north side of Mission Street was bought after the Civil War.
-
April 18, 1906
Heavily damaged in the earthquake and fire; the church was reconstructed.
-
1939
The church rectory adjoining it was constructed.
-
1965
Yerba Buena Center redevelopment plans showed only 15 percent of the roughly 400 buildings in the project area being retained, with the central blocks razed save for St. Patrick's Church.
-
May 1989
Horizontal addition.
-
May 1990
Strengthening repairing lower portion of bell tower.
-
Oct 1990
Complete work on expired app #8908577.
-
Apr 1997
Seismic retrofitting to comply with sfb code #s.14&15.
-
Aug 1997
Umb/revised permit #9706083.
-
Oct 1998
Addition accessible ramp at basement level.
-
Jul 2002
Reroofing.
-
Nov 2002
New elevator to serve new parking garage under app #200210310448.
-
Jan 2004
Reroofing.
-
May 2004
Add 6 sprinkler heads in church basement.
-
Aug 2004
Install 4" inderground fire service and 4" fdc.
-
Apr 2005
Streetspace.
-
Apr 2008
Kitchen remodel, electrical modifications, various doors and railing modifications to meet disabled access requirements. new exhaust flue at exterior (not visible from street).
-
Jul 2009
Revision to permit application #200804180096. provide new 3-compartment sink @ kitchen and storage room.
-
Nov 2010
Reroofing.
-
Aug 2011
Repair stone casing of door; remove deterioated portions of the sandstone detailing @ the main entrance, including cutting back all loose & deteriorated sandstone & repair with jahn-m70 to match the historic color, texture, details, configurations & profiles.
-
Sep 2013
Reroofing.
-
May 2015
Install 5/8 dry wall in both bathrooms basement due to water damage. install tile and partitions. install toilet and sinks in existing locations reinstall all grab bars and paper towel holders. reset existing electrical. repair in kind.
2 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update