Built as the Keystone Hotel; the Central Subway historic architectural evaluation found it individually eligible for the National Register.
-
Jan 1985
The installation of range guard" wet chemical fire.
-
Apr 1985
Addition to existing fire sprinkler system in basement bar.
-
Jun 1985
Parapet work.
-
Feb 1989
Install fire protection in all rms floors 2 thru 7.
-
Jul 1990
Remodel kitchen & bedroom refer to app #9011139.
-
Oct 1992
Remove existing grease flue disconnect from existing blower.
-
Jul 1996
Install a 10' hood (type i) in the basement.
-
Oct 1998
Reroofing.
-
Jan 2001
Replace tile & install anti scald valve(temperature control valve) remove surface wire & reinstall.
-
Jan 2001
Replace tile & install antiseald values temperature control value. remove surface wire & reinstall r.
-
Feb 2001
Install new double windows in exact opening as now.
-
May 2001
Replace tile install antiscald valves temp control valve rmve surface wire/reinstall trim/molding.
-
Jun 2001
Replace tile & install showe pan, replace trim & molding, etc.
-
Aug 2001
Replace tile & install ant5i scaldvalues (tempeture control valeues) install new shower pans.
-
Oct 2001
Replace tile & install antiscald wares, install new shower pans.
-
Jun 2002
Enlarge sidewalk door/install elevator (sprinklers & life safety separate permit).
-
Dec 2002
Renew 8901831 for final inspection.install fire protectn on 2-7 fls.in all rms&bath.on1-8fl bathonly.
-
Dec 2005
Replace kitchen hood with new.
-
May 2006
Remodel room #303 to make ada accessible including bathroom. replace front doors to building to make one 36" and one 24".
-
Nov 2006
Replace existing fire alarm system. 165 horns, 54 horn strobes, 72 smoke detectors, 14 hest detectors, 1 pull station, 28 ceiling counted strobes, 7 remote power supplies, 1 fire alarm control panel.
-
Dec 2006
Strengthen elevatorpit for modernization. structural work only. no work on fire rated walls. upgrade elevator cab. per handicapped access. fire alarm work under separate appl. elevator upgrades under superate appl.
-
Mar 2008
Replace existing sidewalk with new on jessie street & portion of 4th street. fire roofing of structural beams under sidewalk. maintain all exits & fire escapes & fdc's.
-
Mar 2015
Ground level: bar renovation in like kind. equipment replacement, reconfiguring, upgrade finishes and flooring. restrooms to be upgrades to meet acessibility req's. mep to be design/build under seperate permit. maher - not req'd.
-
Jun 2015
Reroofing.
-
Nov 2021
Two units. 2 bathroom remodels only. no structural/exterior work required. no change to wall layout. all work within bathroom. no fire alarm or sprinkler work required. no kitchen in or being added to two units only.