816–818 Mission Street
South Of Market · San Francisco, CA 94103
Permit history
-
Jun 1985
Remove fire escape from rear of building.
-
Jul 1985
Renovate lobby replace front entry door.
-
Mar 1986
Existing third & fourth floors are to be remodeled.
-
Apr 1986
Structural remodel to increase internal resistence of building.
-
Apr 1988
Tenant improvements @ 2nd floor.
-
Jul 1988
Tenant improvements.
-
Sep 1996
New fire sprinkler system.
-
Apr 1997
Interior remodelings for restaurant use.
-
Jun 1997
Remodel toilet rm, barrier removal.
-
Sep 1997
Install new fire alarm system.
-
Sep 1997
Cti-1 floor 5th el me sp.
-
Feb 1998
Oti-1 4th floor el me sp.
-
Feb 1998
Oti-2 4th floor el me.
-
Mar 1998
Oti 1-3rd floor, el, me, ls, sp.
-
Mar 1998
Oti 1-2nd floor, el, me, ls, sp.
-
Jul 1998
Oti 2, el me, ls sp, 3rd floor.
-
Sep 2003
To erect retaining wall on a private st.
-
Nov 2005
(20) new 6'x6' openings for new windows on west wall.
-
Mar 2006
Provide elastomeric coating over reinforced mortar for support and water proofing.
-
Jul 2019
Demolition of non-structural walls, construct new non-structural wall, new millwork and replacing light fixture. no structural and mep work to be incl in scope. mep under separate permit.
-
Aug 2019
F/a: provide new devices to cover the new remodel areas at floor 2, 4 & 5. materials include 3 remote power supply in each floor, 9 smoke detectorsm 13 strobes, and 15 horn strobes.
-
Sep 2019
Revision to 201907115620 - accessibility upgrades misc work at vestibule on fls 2, 4, 5. bld entrance and adjacent sidewalk upgraded.
-
Sep 2019
Installation of new hvac system and diffusers. ref arch # 201907115620.
-
Dec 2020
Provide and install the required fa devices to maintain a minimum compliant system. fire alarm system tenant improvement. prime electric will be adding (3) strobes total and relocate (1) horn strobe. ref. 2020-1021-7084.
-
Apr 2022
Emergency panel replacement. all devices will be replaced 1 for 1.
DBI holds 54 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 54. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. Submit an update