1924
Built for the San Francisco Chronicle and, unlike the paper's earlier building at 690 Market Street, devoted entirely to producing and printing the newspaper. Gothic Revival in style and since altered; its design shows the influence of Eliel Saarinen's 1922 drawing for the Chicago Tribune Tower.
-
1960s
The building exterior was remodelled.
-
Nov 1984
Additions alterations or repairs.
-
Apr 1985
Alterations to existing 3rd floor editorial offices.
-
Jul 1986
Alteration to existing print handline system at basement.
-
May 1987
Add new mechanical penthouse.
-
Oct 1992
Interior demolish for future t/i in bsmnt, 1st & 2nd floors.
-
Dec 1992
T.i.-add lunchrm, restrms, small conf rm in basement area.
-
Jan 1993
1st & 2nd fl tenant improvements and seismic upgrade.
-
Feb 1993
1st and 2nd floor tenant improvements and seismic upgrade.
-
Oct 1994
Demolition exist parts-ten improc-alter exist mechanical electrical system.
-
Jul 1995
Reroofing.
-
Mar 1996
Interior remodel demol of existing partitions new partitions.
-
May 1998
Oti-2.
-
Aug 2007
Reroofing.
-
Mar 2010
1st floor-office tenant improvement-interior remodel of existing office area-new partitions, new lighting & electrical, some new ceiling soffits, new flooring & painting, new sink at existing plumbing, new fire sprinkler drops & new hvac ducting only.
-
Jan 2011
Suite #201 & @202 - demolition drops back to branchlines & replace existing pendant sprinklers with upright sprinklers. add armovers to ensure sprinklers are in correct distance for code compliance. any armovers greater than 4'-0". add branchline restrints seismic restraints for existing pipe are not in scope of work.
-
Mar 2011
Replace chiller #1 with new mechanical penthouse.
-
Apr 2011
2nd floor office tenant improvement - demol existing ofice improvements, provide 2 new exits to existing corridor; build offices, meeting rooms & open office areas with cabinetry & related coffee bar plumbing.
-
Feb 2012
Remove and replace one air handler and one fluid cooler.
-
Aug 2017
Renovation of existing tenant space on basement, 1st fl, mezzanine, 2nd fl. consists of demolition and improvement office non-bearing partitions, suspended ceiling systems and finishes, const of new ti space new open & closed office space, conference rm, copy rm, cafe, lunch and storage rm.
-
Apr 2019
3rd fl suite 306 ti includes, demolition of e finishes and providing new finishes. all new or revised mep life safety will be design build and submitted separately if needed. n/a for maher.
-
Nov 2020
3/f: t.i. of existing office space including selective demolition of non-load bearing partitions, new finishes, millwork & furniture. mep under sep permit if affects existing system if needed. building is fully sprinkled.
-
Dec 2020
Remove existing water chilled cooler and replace with new. modify existing support for new footprint.
-
Apr 2021
Fire sprinkler permit. relocate 213, add 19, and delete 27 sprinklers on the 3rd floor. t.i. # 2020-1123-9545.
-
Jun 2021
Design intent of modifying fire alarm devices layout to accomodate changes on 3rd floor due to a new t.i. project. added devices include horn/strobes, 10 strobes, 3 smoke detectors, 2 manual pull stations.
DBI holds 124 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 124. 1 of them are nominal $1 street-space or sidewalk permits.