944–948 Market Street
South Of Market · San Francisco, CA 94102
-
1940s
During the Second World War the Pepsi-Cola Center for Service Men and Women operated here at the corner of Mason, offering free showers, barbers, banking, lounges and dormitory beds to military personnel.
-
Apr 1973
Created during job card conversion on: 04/19/84.
-
1975
The Bay Area Feminist Federal Credit Union, the first financial institution in San Francisco owned by women, operated from suite 616 here from 1975 until 1979.
-
May 1984
Remodeling floor tenant space, ceiling, walls, electrical.
-
Apr 2006
Interior remodeling for a retail (shoe) store (ground floor) partial height partitions/doors - no work on mezzanine. submit seperate fire sprinkler permit.
-
Aug 2009
Demolition of non-struc. partitions at 2nd floor.. t.i under separate permit. building is not fully sprinklered.
-
Aug 2009
2nd fl office ti. (demolition under 2009.08.24.5410). new non struc partitions. all new revised hvac, electrical, plumbing, life safety under separate permit. builiding not fully sprinklered.
-
Jan 2011
Ti to convert existing retail space to new retail space. add new unisex restroom and office at retail soace at ground floor. no change to existing exterior of building.
-
Sep 2012
Interior remodel of 8th fl office space, plumbing and electric under separate application.
-
Oct 2012
Demolition existing wall paneling. replace with sheetrock where needed. demolition existing floor tile, install new floor tile, paint throughout lobby. all electrical, mechanical, plumbing & fire under separate application.
-
Jun 2013
Interior remodel of the 4th floor office space. plumbing, electrical, and fire sprinkler under seperate application.
-
Sep 2013
Demolition of interior non load bearing walls, new offices and support facilities. electrical, life safety, plumbing, and sperinkler work sep permit.
-
Oct 2013
8th floor-mechanical work associated with permit application 2012-0904-8834.
-
Dec 2013
4th fl. mechanical work associated with permit application 2013-0610-9059.
-
Feb 2014
Remodel tenant space. demolish existing interior partitions, baths. build new interior partitions, bathrooms, coffee area. mechanical, plumbing, electrical separate permit.
-
Jul 2014
3/f - ti- full floor remodel incl. new partitions, m/w bathrroms, kitchenette, (3) offices & open desk space. mep, ls, and sprinklers on separate permits. entry door from stair/elevator lobby on separate permit. n/a maher ordinance # 155-13.
-
Sep 2014
Remove and replace elevator lobby doors with new 1.5 hour rated doors at floors 3, 6, 7.
-
Dec 2014
3/f: mep for modification and redistribution of existing air distribution system, ref 201407282305. compliance with maher ordinance 155-13 not required.
-
Jan 2019
Temant improvement of existing lobbies on 3rd & 4th floors. new interior finishes and lighting. provide door actuator at entrance door.
-
Jul 2019
Demolition & ti of existing 5th fl excluding elevator & stairs lobby. new inteirior finishes & restroom upgrades. mep, fire sprinklers under separate permit.
-
Jul 2019
3rd floor - ti - int only. new finishes & furnishings throughout, new non structural partitions. demolition men's and women's restrooms. new ada gender neutral restroom upgrades (2 total). mo structural work. mep/fir/life saftey under sep permit.
-
Aug 2019
Alteration of hoistway of (2) passenger elevators, elevator #1 existing basement winding drm equip. to be removed and replaced with basement geared traction equipment, elevator #2 existing bsement geared traction pasenger elevator to remain and addition of (2) passenger elevator cars.
-
Jan 2020
Interior t.i. for condo sales office existing handicapp restroom to remain. existing mezzanine to remain. no change to store front.
-
Jul 2020
Change of use of existing basement space from storage to retail.
-
Sep 2021
(like for like) fire system replacement due to elevator modernization with new panel. smoke detectors and pull station same location. install relay modules and smoke detector for elev recall. tie in existing notification devices to new panel. install new annciator.
-
Mar 2023
Replace sub sidewalk basement roof slab affected by gtraffic signal poles and curb ramps.
-
Nov 2025
4th floor: tenant improvement of existing 4th floor office space, new interior non-structural partitions. plumbinf, mechanical, electrical uner deferred submittal.
DBI holds 75 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 75. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update