34–38 Mason Street
Tenderloin · San Francisco, CA 94102
Permit history
-
Feb 1983
Additions alterations or repairs.
-
Jul 1991
Erect sign.
-
Jun 1992
Make repairs to walls - replace sheetrock.
-
Nov 1998
Reroofing.
-
Apr 2001
Ordinance 225-92- special procedures seismic upgrade.
-
Jan 2002
Rev. to permit application 2001/04/10/6485 - relocate restrooms from 1st floor to basement.
-
Mar 2004
Remodel existing restaurant & office space to create new mixed use occupancy assembly & office space.work.
-
Mar 2004
Bar and kitchen demolition while waiting for app #2004/03/08/8050 to be issued compliance with ab-017 soft.
-
Sep 2004
Plans submitted for elevator recall system and smoke gaurd system.
-
Sep 2004
Installed fire suppression system to kchn hood.
-
Oct 2006
Install a fire sprinkler system to protect the entire building (fire sprinkler work only).
-
Oct 2006
Convert vacant 3rd floor from office to assembly. upgrade exiting sprinkler under separate permit. disabled access under attached ref. set 2004/03/08/8050, sprinkler 2006/10/12/4764.
-
Dec 2006
Convvert vacant 3rd floor offices to offie and a "b" person vip lounge to bar on 1st floor & 2nd floor. no bar area on 3rd floor/dispensisng of liquor on 3rd floor.
-
Dec 2006
Widen rear 2nd exit on 1st floor to allow increase of occupant load of a-3 on 1st & 2nd floors. also add disabled drinking fountains on basement, 1st & 2nd floors. no other work, site disabled access. 200403088050.
-
Jan 2007
Monitor water flow & tamper by adding communicator to existing local control panel.
-
May 2010
Demolition of existing counter service & remove existing glass partition wall to amend appl. permit # 201005122277 to show existing condition.
-
Aug 2012
T.i. remodel existing bar/restaurant, electrical, plumbing, mechanical. and occupant load per new space configuration.
-
Sep 2012
Install partions walls, doors, glass on 3rd and 4th floor office tenant improvement. walls have clearance from sprinkler heads of 18 inches- sprinklers require no changes- upgrade 2 existing non-compliant toilet rooms to compliance. mep under separate permit.
-
Nov 2012
2nd/3rd floors-due to change of occupancy, new office & restaurant in basement. new notification devices will be added to the existing system. new ansul system installed by others, will be tie into existing control panel located on 1st fl. 1 existing horn/strobe will be replace with newer model. ti permit application 2012-0918-0044.
-
Dec 2012
Adding horn/strobe lights to the existing fire alarm system on all floors. also add the ansul system to the fire alarm system.
-
Jan 2013
Revision to a3. modification of partiton wall. 201208318753. alter shape of wall. interior work only.
-
Mar 2013
Revision to permit application 201208318753 - replace existing type 1 hood with a new etl existing type 1 hood and relocate 3'-0" from the existing location.
-
Jun 2013
Automatic fire suppression system installation over new kitchen hood.
-
Feb 2021
Installation of a co2 monitoring system.
DBI holds 31 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 31. 2 of them are nominal $1 street-space or sidewalk permits.