141–145 Eddy Street
Tenderloin · San Francisco, CA 94102
Permit history
-
May 1971
Created during job card conversion on: 04/19/84.
-
Mar 1984
Doors locks plaster paint carpeting plumsbing.
-
Sep 1985
Parapet safty program.
-
Sep 1987
Add laundry rm, bath, shower, janitor's closet @ 1st floor.
-
Sep 1994
To comply with nov 1-26-94.
-
Aug 1996
Construct additional new lobby and front office.
-
Aug 2001
Umb upgrade siesmic upgrade full coverage sprinklr sym superused fa sym 2 exits fr each floor disabl.
-
Dec 2003
Using the existing sprinkler main suppy at basement. install 645 sprinklers to 5 story /1 bsmt building.
-
Dec 2003
Mechanical systems all new, plumbing, fire protection, alarm and sprinkler sep permit 2s001/08/13/5936 s1.
-
Feb 2004
New fire alarm system in existing building.
-
Apr 2004
Revises 2001081315936 s-2- minor interior layout changes at the bsmt & 1st fl. no exterior changes.
-
Aug 2004
Reinstall rebuilt awning at entry.
-
Sep 2004
Final plan revision to appl#200108135936 clouded on plan sheets.
-
Jun 2005
Remove / dissable 1 fire smoke damper incorrect design & not required by code.
-
May 2006
Renew 200506235862 for final inspection.
-
May 2017
Renovation of existing restroom & addition of a new ada restroom. new lighting and power door operator, change of use to entertainment art, activities.
-
Dec 2020
Voluntary replacement & upgrade with lf horns to meet sffc 2019 sec 1103.7.6.1 replace of facp, smoke detectors, pull stations, monitor modules, relay modules, horn strobes, strobes, bell heat detector. install of new lf horns in every sleeping area and radio communicator.
-
May 2022
Install 1 electric, projecting, double faced wall sign. "safe house arts". 2' x 2'.
-
May 2022
Paint 1 wall sign. "saving art from extinction". 8" x 17'1".
-
Aug 2024
To comply with nov #202423524; #2, #3, #4, #5. remove and replace existing showrer surround, shower valves, and shower pan with new tile surround and tile shower pans in two common restrooms(5th floor), same layout.
-
Oct 2024
4/fl-remove and replace existing shower pans and tile surrounds in the (2) 4th floor common shower rooms, following existing layout, no plumbing alterations - includes replacing existing shower valves. remove and replace existing exhaust fans, following existing layout, no electrical alterations needed.
-
Nov 2024
R & r shower pans and tile surrounds in one (1) 3rd fl and one (1) 2nd fl common shower rooms, following existing layout, no plumbing alterations includes replacing shower valves. r & r existing exhaust fans, following existing layout no electrical alterations needed.
-
Dec 2024
Install new shower pan and tile surround to one common shower on the 2nd and 3rd floors, following existing layout, no plumbing alterations needed - includes replaceing existing shower valves. replace existing exhaust fan in each (2) common shower includes relocation of existing electrical for new timer switch install.
-
Dec 2024
Replace existing tub in 1st floor common bathroom with new american standard tub. following existing layout - includes replacement of existing shower valve and tile surround. replace existing exhaust fan and relocate existing electrical for new timer switch installation.
-
Jan 2025
One unit - kitchen remodel: replace cabinets, countertop, same location and layout. no plumbing alterations. relocate existing electrical wiring in kitchen, following fire - includes installation of new fixtures.
DBI holds 27 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 27. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update