34–48 Turk Street
Tenderloin · San Francisco, CA 94102
Permit history
-
Jan 1983
Repair roofing, etc.
-
May 1983
Additions alterations or repairs.
-
Nov 1986
Put in sheetrock, taping, texturing, paint, replace windows.
-
Jan 1989
Re-open window in 3rd floor bathrm, comply with dahi report.
-
Jul 1992
Construct small office in hotel lobby.
-
Aug 1992
Reroofing.
-
Sep 1992
Rrepl water line to 6 bathrms. r/r sheetrk. repair dry rot.
-
Jan 2001
Work includes structural alt/aptmnt renovatn/accessibility upgrade gr fl egress sidewlk vault.
-
Aug 2002
Rev#200101240467, s-1, r-1 infill @ 1st floor with minor change to cross walls calc & ties of interior wal.
-
May 2003
Upgrade fire alarm system throughout building to comply with cbc, non high risk.
-
Jun 2003
Extend existing fire sprinkler system to provide full building protection.
-
Sep 2004
Upgrade fire alarm system throughout building to comply with cbc, cfc, + nfpa 72 1999, area smoke detect.
-
Dec 2004
Laundry room - (2) supply fans, duct work, register, no fsd required, dryer vent duct work.
-
Feb 2005
Fire smoke damper added after completion of project s.f. bldng. permit application 2003/05/28/5600.
-
Sep 2011
Roof-upgrades to roof rafters for installing solar thermal panels.
-
Oct 2011
Roof coating over existing roof.
-
Oct 2017
Cosmetical repair of gyp board in existing elevator shat. pit repair. interior repair of mechanical room. no structural work.
-
Oct 2017
Install fire rated door (replace) in first floor hallway supply closet.
-
Jun 2018
Removing 3 fire sprinkler from elevator machine room at hoistways in existing building.
-
Jun 2018
Add two relays for fire person's hat for elevator company. remove five detectors in elevator areas with sprinkler heads due to removal per preapp meeting, and dated june 8, 2018. refer fire permit application 200305285600. in basement & 7/f.
-
Oct 2018
1st floor art studio. insulation, sheetrock, painting. cosmetic work only. no change of floor plan. exempted da-002 check list.
-
May 2019
Like for like system replacement with new control panel smoke detectors, pullstations, relay modules for elev. recall, monitor modules for tamper switches. install radio communicator. tie-in notification devices in common area, replace ex. horns with new low frequency sounders.
-
Aug 2024
Remove and replace existing walk-in tile shower flooring and surround for the common showers on the 7th, 6th and 5th floors. following existing layout. no plumbing alterations needed.
-
Sep 2024
2nd, 3rd, & 4th floor: remove & replace existing tile shower pan and shower surround in common shower rooms. following existing layout, no plumbing alterations needed. relocate existing light fixtures with electrical adjustments includes upgrading existing timer switches.
DBI holds 27 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 27.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update