Permit history
-
May 1982
Additions alterations or repairs.
-
Jan 1983
Additions alterations or repairs.
-
May 1983
Additions alterations or repairs.
-
Jun 1983
Additions alterations or repairs.
-
Sep 1984
Repair of houes in wall & ceiling, replace toilet.
-
Nov 1984
Parapet walls on roof.
-
Mar 1993
Completi all items in compliance with viol notice to abate it.
-
Jun 2001
Ubm: seismic retrofit wrks, general proceedure.
-
Oct 2001
Upgrade fire sprinkler.
-
Jul 2003
Umb special procedure - seismic upgrade.
-
Apr 2004
Renew appl#9922382 for final inspection.
-
Jun 2004
Umb special procedure seismic upgrade revision to approved building permit app #200307300753.
-
Feb 2005
Monitor fire alarm and sprinkler system for sprinklers installed under sro ordinance connection of.
-
Jun 2005
Reroofing.
-
Dec 2009
Renew for final sign off to coplete with sro sprinkler ordinance. per app #200110090212. all work work is complete.
-
May 2013
To comply with ordinance 029-13 only; installation of grab bars in sro at the following location: 74 turk st 2nd to 4th floor.
-
Jun 2013
Route to planning for preservation sign-off. partial compliance with nov 201302041 dated may 2013. update current store front in vacant space. tenant improvement on a separate permit. accessibility compliance will be filed under separate permit per sfbc ab-017.
-
May 2014
To comply with nov 201467051, 201468856 & 201471644 (partial compliance) - reubstakk danaged grab barm reokace 9 windows & repair 12 windown, install 10 doors & repair or replace 11 door jams.
-
Mar 2016
To comply with complaint #201600811 adding 25 bathrooms renovating 3 existing bathrooms and other minor alterations.
-
Mar 2016
To comply with nov#201600811: restoring bathroom on 4 floors. replace fixtures, removed wwop. no walls moved, removed added or infilled. all existing layouts to remain unchanged.
-
May 2017
To comply with complaint #201302041. paint and patch holes where electrical repairs will be done. repair any tile work paint to rooms, paint and repair sheetrock in hallway. remove expose tv cables and 1/2 flexes. replair some water leaks and repair dry rot wood. repair for work stated only.
-
Mar 2018
Patch and paint walls and ceiling where all electrical work was done. paint all 3 floor hallways and common repaired floors. texture all walls and install tile in all hallways common areas.
-
Jun 2018
Relocating existing fire alarm conduit inside walls. add 21 smoke detectors in corridors.
-
Nov 2022
Fire and water damage repair within envelope no structural damage comply with nov's 201302041 and 202291493.
DBI holds 27 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 27. 2 of them are nominal $1 street-space or sidewalk permits.