1018–1024 Mission Street
South Of Market · San Francisco, CA 94103
Permit history
-
May 1983
Additions alterations or repairs.
-
Nov 1989
Ewo-s.
-
Mar 1999
Seismic rtrofit of unreinforced masonry building per ord.
-
Aug 2000
Install partition walls, modify exist bathrm to handicap accessible use/install electric wiring/pain.
-
Sep 2000
Revision to approved plans building. permit appl#2000/08/30/9221 installing of dropped ceiling suspended.
-
Jan 2001
Fabricat & install 1 awning frame.
-
Jun 2001
Replace stairs to basement in kind rev. to appl#200008309221 & 200009281779.
-
Oct 2002
Comply with residential hotel sprinkler ordinance #170-02.
-
May 2003
Install fire sprinkler system to comply with ordinance #170-02.
-
Sep 2004
Replacing of steel beam in kind beneath sidewalk and replacing of approx 90 sq ft or sidewalk.
-
Apr 2005
Install communicator to existing fire panel.
-
Jun 2005
Modify opening for elevator door at all stops. comply with nov 200561190.
-
Sep 2005
Sprinkler remodel.
-
Nov 2005
Fire, smoke & water damage repair in room no 414 also water damaged rooms below.
-
Mar 2009
Replacing baseboards, less than 10% plaster/drywall repair, painting, carpet & pad replacement for #403, #303, #302, third floor hallway, #203, #202, second floor hallway #103, #102 & lobby.
-
Feb 2010
Obtain a building permit for sign located at 1018 mission street as required by sign id numbers " orig 616" per planning notice of requirements dated 12/23/09.
-
Jun 2013
Comply with ordinance 029-13 only-installing grab bars-all common bathrooms.
-
Apr 2022
To comply with nov# 20203312: replace (4) fire escape windows with double hung windows (2-5th fl). windows in showers opposite 401 abd 201 to be infilled on separate permit. #4 grab bars to be replaced on seprate permit. street facing wood windows on 2nd floor to be replaced. #5 handrails to be fixed.
-
Dec 2022
Remodel in kind (8) common toilets and showers. interior only.
-
Dec 2022
Remodel bathroom, in kind.
-
Apr 2023
Relocation of existing managers unit @ 2nd floor, new bathrooms for rooms on 2-5 floors, 4 new bathrooms with grab bars @ rooms 117, 217, 317 & 417, new common use offices for residents on 2-5 floors, no change to existing unit count. new ada push button at g/f, new reception counter.
-
Jun 2024
Provide fire sprinkler heads in new added bathrooms.
-
Mar 2025
Remove and replace existing facp (5700 sk) with facp (6808 sk). provide and install one new cellular communicator. remove & replace existing bells with a/v hornstrobe, smoke detector & pull station. provide & install 2 bps & one new pull station next to facp. fire alarm contractor to provide all new.
-
May 2026
Repair &repaint wood windows where needed.reseal windows whre needed.repair brick mortar deterioration, lubricate fire escape accordian ladders.remove and repaint rusted areas on fire escape landings, metal cornices&canopy roof slab.repair chipped brick at level 3 window opening.(east wall-mission st).
DBI holds 32 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 32. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update