64–68 Sixth Street
South Of Market · San Francisco, CA 94103
-
August 28, 1950
The Office of the Assessor-Recorder photographed the property for tax assessment. Jack Rhode Tailors & Cleaners was at the address.
-
1966-07
The Office of the Assessor-Recorder photographed the property for tax assessment. Downtown Cleaners & Laundry; Marques watch and lock repair were at the address.
-
Jan 1982
Additions alterations or repairs.
-
Apr 1982
Additions alterations or repairs.
-
Nov 2000
One stop: mt const. of a new concrete reataiing wall for sub sidewalk improvemnent.
-
Nov 2000
Horiz. addition at rear of blndg -new deck.
-
Feb 2001
Renovate kitchen with all new finishes & fixtures provide new opening in existing wall, add new steel pos.
-
Mar 2001
Structural improvements to unimproved storge area in basement as shown in plans provided. decks are.
-
May 2001
Umb strengthening per sfbc ch. 16, special procedure. upgrade hc accessibility, toilets, entrances.
-
Sep 2001
Int modifications ( per attached plan) to convert existing 2 residental units to one residential un.
-
Feb 2003
Reroofing.
-
Apr 2003
Installing fire sprinkler system to comply with sro ord.#170-02.
-
Jul 2003
To intall fire sprinkler system to comply with ordinance 170-02.
-
Aug 2004
Rev. to permit application 2001/05/21/9685 for relocating accessible bathroom and restoring entry.
-
Jan 2006
Upgrade existing fire alarm system to new system all 4 floors and basement.
-
Apr 2010
One unit(64-6th. ave.) kitchen & bath remodel reconfiguration of int. walls. one unit(62-6th. ave.) new bath-reconfiguration of int. walls, window replacement. all to match existing.
-
May 2010
Revision to permit application 2010.04.05.9600. unconditioned lightwell infill for the garage on 1st floor. structural improvements. lower slab at rear of building.
-
Dec 2010
To complete work and obtain final inspection for work approved under permit application 200801313653.
-
Jan 2014
Reroofing.
-
Sep 2015
Replace cabinets and countertops, new flooring and new paint in kitchen and pantry in kind. no structural work.
-
Dec 2015
Conversion of ground floor tenant space from barber shop to limited restaurant. demolition of interior walls, construction of new partitions, cafe counter, plumbing electrical & mechanical. reduce size of storage room in basement ** maher: n/a **.
-
May 2016
Demolition of existing walls; construction of new cafe counter; reno of existing toilet to ada compliant toilet, reopening of infilled windows and doors, new lighting, plumb and mechanical; new doors actuatores at entry door, inside and outside. consturct new glazed window at facade. replace store front windows & frames.
-
Jan 2017
Interior improvement. new accessible bathroom. new stair to basement (interior). replace existing storefront and entry door in kind. replace existing metal sissor gate in-kind. maher na.
-
Jul 2022
Renovate kitchen, 2 bathrooms and mudroom. partial infill of lightwell, convert bedroom to wetbar, recofigure walls. paint exterior 4 interior.
-
Jan 2025
Comply with nov 202430231. remove existing 6" raised platform at counter area replace existing counter.
-
Jul 2026
Remodel 2 bathrooms, same layout, fixtures in same location. replace 3 windows, not visible from street - in kind.
DBI holds 56 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 56. 6 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update