72–76 6th Street
Hotel · South of Market
-
1907
Built.
-
Dec 1996
Comply with umb ordinances.
-
Nov 2007
Replace door with 20 min rate, remodel bathrms, replacing plumbing & electrical fixtures, runaces, windows not visible from st. plaster repair and comply with active complaints.
-
Mar 2010
Upgrading bathrooms at 2nd., 3rd., 4th. & 5th. floors. by adding accessible shower, tub & 2-toilets on each floor. remodeling first floor. lobby, bathrooms & entry. comply with his/nov 200915862, 201034604 & 2005604425.
-
Jun 2011
Install (7) new heads in basement. install (38) new heads in t.i. spaces on 1st floor & upgrade main riser in basement.
-
Sep 2011
Change of use from existing laundry to new office use at sfpd substation, includes new offices, new conference area, new kitchenette, new accessible bathrms, showers, entry and glazing.
-
Apr 2015
Renovation of 1st fl, basement, inerior finishes: 2 accessible bathrs, addl kitchen, add laundry&mailboxes for tenant use, replace front auto sliding door system, remodel front/rear lobby, managers office, breakroom, ad storage see 1008.1.4.3 cbc.
-
Nov 2017
Remove tile from 2nd & 3rd floor shower stall, remove any dry rot in framing, replace shower valve and re-ajust floor drain. replace old receptacles and light switches, replace exhaust fan in kind in two rooms. remodel 2 bathrooms, to comply with nov# 2017400241.
-
Apr 2018
4th and 5th floor. remove and replace all tile and sheetrock from shower stall walls, replace 1 electrical switch, install new hardieback board waterproof shower stall with shower pan test. install new tile at 4th and 5th floor shower area.
-
Jun 2019
New accessory dwelling unit addition with in existing building footprint at lower level/basement floor. this includes new kitchen, bath, living/sleeping area per ord# 162-17.
-
Dec 2019
Remove and replace (8) 90 min fire rated metal doors with frame to 2nd, 3rd, 4th and 5th level bedroom entrance. remove and replace (8) 90 min fire rated metal doors with frame to 2nd, 3rd, 4th and 5th level to hotel rooms entrance. total of (16) 90 min fire rated matel doors with frame.
-
Jun 2020
Replace a total of (26) 90-min fire rated metal doors with frame in existing locations, in-kind, on floors 2-5 to all trash rooms and bathroom rooms in common/public areas in hallways. maher n/a.
-
Sep 2020
Bathroom remodeling: 3 shower rooms new tile. 3 ada bathrooms paint and new tile only.
-
Sep 2026
Comply with complaint 202661911, item #4: c: the 2 side shower rooms next to the stiars on the 2/f had the drywall and shower pans removed. to sheetrock & weatherproof showerpan & retile. item 8: replace interior handrails from basement to ground floor.
DBI holds 84 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 84. 5 of them are nominal $1 street-space or sidewalk permits. 12 expired or cancelled permits are not shown.
Nearby
- 65–77 Sixth Street Same street
- Bayanihan House Same street
- 64–68 Sixth Street Same block
- 48–62 6th Street Same block
- 1018–1024 Mission Street Same block
- 42–46 6th Street Same block
- Hulse Bradford Building Around the corner
- Brunswick-Balke-Collender co. Billiard Table Manufacturing Around the corner