Bayanihan House
80–96 6th Street
-
1912
Built.
-
June 20, 1912
A builder contracted to put up a five-storey brick hotel and store, at $78,200.
-
1990s
The Delta Hotel, a single-room-occupancy hotel, was turned into affordable housing in the early 1990s, largely for Filipino veterans of the Second World War.
-
1997
Gutted by fire, and rebuilt as Bayanihan House with 40 units of subsidised housing and 152 furnished single-room-occupancy rooms. The ground floor took the Bayanihan Community Center and the Arkipelago bookshop, and the building became the headquarters of the Veterans Equity Center from 1998.
-
1997
Fire broke out in the Delta Hotel, leaving many Filipino World War II veterans who lived there without homes.
-
Oct 1997
Demolition & remove fire damaged walls and debris/build temp roof.
-
Jul 1999
Fire damage repair, building unoccupied, reframing & reroofing.
-
Oct 2000
Non structural interior demolition. remove plumbing fixts.pipes electrical line plaster lath doors @.
-
Mar 2001
Renovation of vacant sro (delta) hotel fire damaged in 1997.
-
Apr 2002
Installation of fire alarm system in delta hotel renovation project as electrical subcontractor.
-
Jun 2002
Install sprinkler system.
-
Jul 2002
Revision to app #200103063601/substitute non-structural and non bearing wood stud walls with metal stud.
-
Dec 2002
Tenant improvements to existing vacant ground floor commercial space, new womens restrooms, , ceiling.
-
Apr 2004
Installation of panic hardware per n.o.v. dated 10/14/03.
-
Aug 2004
Revision to existing buel pump location that sffd rejected/new fuel pump located at ground floor t roof.
-
Mar 2005
Additional work to approval t.i permit. includes non structural partitions & kitchen cabinets.org.
-
Jul 2005
Install additional devices to existing fire panel.
-
Nov 2005
Renew permit #200212123360.
-
Sep 2007
Build counter with granite top approx 20 ft linear ft. tile all floor. no structural work.
-
Oct 2008
Erect a non-electric, non illuminated double faced projecting sign.
-
Oct 2008
Erect a non-electric, non illuminated double faced projecting sign.
-
Sep 2019
New grab bars in showers to comply with violation complaint 201973372. total of 16 showers.
-
Feb 2025
Replace existing cooling system wit new split system. replace existing fluid cooler with new, same size capacity.
DBI holds 40 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 40. 1 of them are nominal $1 street-space or sidewalk permits. 7 expired or cancelled permits are not shown.
Nearby
- 65–77 Sixth Street Same street
- 87–99 Sixth Street Same street
- 64–68 Sixth Street Same block
- 1018–1024 Mission Street Same block
- 48–62 6th Street Same block
- 1026–1028 Mission Street Same block
- 986 Mission Street Around the corner
- 1013 Mission Street Around the corner