875 Stevenson Street
Office building
-
1975
Built.
-
Oct 1996
Cti 1 5th fl el me sp.
-
Sep 2012
Interior demolition existing tenant build outs, base building core-shell upgrades & new finishes. exterior envelope renovation of floors 3-10 including. removal of existing precast concrete panels and replaced with a new glass curtain wall skin.
-
Dec 2012
Mechanical, electrical, and plumbing for core and shell. improvements to coincide with architectural/structural improvement submitted under 2012-0905-8914.
-
Sep 2014
Interior tenant improvements on the 8th floor. including demolition, new drywall, ceilings doors, millwork, interior glazing and finishes. mechanical and electrical. under seperate permit. note: final completion pending issuance of ab-056. letter for app#201406168521. see da check list. n/a for the maher.
-
Sep 2014
9th floor. interior tenant improvements on 9/f including demolition, new drywall, ceilings, doors, millwork, interior glazing and finishes. mechanical, electrical and food service under seperate permit.
-
Sep 2014
10th floor: interior tenant improvements on the 10th floor, including demolition, new drywall, ceilings, doors, millwork, interior glazing and finishes. mechanical, electrical & food service under separate permit. final pending ab-056 approval.
-
Sep 2014
2nd floor: interior tenant improvements on the 2nd floor, including demolition, new drywall, ceilings, doors, millwork, interior glazing and finishes. mechanical, electrical & food service under separate permit.
-
Nov 2014
9th floor - mechanical, electrical & plumbing work associated with permit application 2014.0917.6534, duct work, dampers, vav boxes & lighting.
-
Nov 2014
10th fl: mep associated with 2014.0923.7058. work includes ductwork, new fire dampers, vab boxes lighting power and data. mahn n/a. sprinkler, alarm & kitchen to be under separate permit.
-
Dec 2014
2nd floor: mechanical and electrical & plumbing associated with 201409307645, work includes new ducts, 12 new smoke/fire dampers vav boxes, lighting, electrical, data, telephone & plumbing for hvac.
-
Apr 2015
3rd floor: interior tenant improvements including demolition, new drywall, ceilings, doors, millwork, interior glazing and finishes. mechanical and electrical under separate permit.
-
Apr 2015
Interior tenant improvement 4th floor include demolition, drywall, ceilings, doors, interior glazing and finishes. mechanical. and electrical. under seperate permit.
-
Apr 2015
Interior tenant improvement on 6/f include demolition, new drywall, ceilings, doors, millwork, interior glazing and finishes. a new communicating stair between 5th and 6th floor. mechanical. and electrical. under seperate permit.
-
Apr 2015
7th & 8th floor: ti including demolition, new dry wall, ceiling, doors, millwork, interior glazing and finishes, a new communicating stair between the 7th & 8th floor. m&e under seperate permit.
-
Apr 2015
Interior tenant improvements on the 5th fl, including demolition, new dry wall, horizontal exit, ceilings, doors, millwork, interior glazing and finishes, mechanical and electrical under sep permit.
-
Apr 2015
4th floor: mechanical, electrical, plumbing associated with approved permit # 201504093242. new mechanical, electrical system. t.i. fit out attached to existing base building system. sprinklers and fire alarm separate permit. adding 4 fire smoke dampers.
-
Apr 2015
3rd floor: mechanical, electrical, plumbing associated with approved permit # 201504083072. new mechanical, electrical system. t.i. fit out attached to existing base building system.
-
Apr 2015
6th floor: mechanical and electrical associated with 2015-0409-3243. new mechanical and electrical t.i. fitout connected to existing base building systems. life safety deferred (& combined with 5th fl). 5 new fsds.
-
Apr 2015
7th fl: work associated with 2015-0410-3304 - new mechanical & electrical fit out connected to existing base building systems. life safety deferred (fa to combine 7 & 8 fl). 5 new fsds.
-
Apr 2015
5th floor: mechanical, electrical & plumbing associated with app#201504143546. mechanical, electrical, & plmg fitout connected to the existing building systems.
-
Jul 2015
An elevated walkway (skybridge) connecting 875 stevenson st to 1355 market street at the 9th fl of both building. (spans across 855 stevenson) see also permit application 201603182439 and permit application 201603182440 for easements to 1355 market st and 855 stevenson street. ** maher: n/a **.
-
Dec 2023
Replace (3) ahu with new on roof.
DBI holds 262 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 262. 14 of them are nominal $1 street-space or sidewalk permits. 3 expired or cancelled permits are not shown. FITNESS SF gives its address here as 1 10th Street, this building's frontage on 10th Street; the city's address registry has no such address, and DBI files the gym's own permits on this parcel as 875 Stevenson Street.
Nearby
- 510 Stevenson Street Same street
- 1307–1329 Stevenson Street Same street
- 1338 Mission Street Same block
- 66 Ninth Street Same block
- 1390–1398 Mission Street Same block
- 1366–1372 Mission Street Same block
- 55–59 Ninth Street Around the corner