2514 23rd Avenue
Sunset Parkside · San Francisco, CA 94116
-
before 1925
A Craftsman-style house, among the larger homes built here before the stucco row house took over the district.
-
Nov 1989
Reconstruct retaining wall.
-
Dec 1989
Excavate soil and underpin existing footing at n-w crn of garage.
-
Aug 1993
Add door to garage.
-
Jul 1994
Replace 2 rotten wood windows and remodelexistingtoilet compartmt.
-
Sep 2007
Site permit for vertical and horizontal addition. remodel 1st and 2nd floors existing structure.
-
Jan 2009
Structural work on 1st floor framing, new retaining wall(replace existing damaged wall in kind) to address complaint #200988255. shoring under separate permit prior to start construction. obtain cal/osha permit prior to excavation and construction.
-
May 2010
Convert crawl spce to storage, cap existing foundation. roof framing & add 3-dormers, stairs from basement to attic. replace windows & trim in-kind. remodel kitchen & bathrms.comply with complaint#201030664, #200680930, #200906761.
-
Jan 2011
Comply with nov# 201030664 & 200988255-replace existing skylights, new gutters & down sprouts. replace broken windows, replace existing rear patio doors, misc siding repair, mold remedation at basement level. removal of sheetrock 5' a.f.f at basement for mold remedation.
-
Jan 2011
Reroofing.
-
Jun 2011
Alter existing external stairs at rear yeard. replace unreinforced concrete foundation. remove illegal in-law kitchen. add 2x10 to existing joists at ground floor. dry rot at basement level sill plate. correct nov's #20113322, 2010050907, 20098825, 201030664.
-
Mar 2016
To obtain final inspection for work approved under permit application 2011-0120-8698. all work is complete.
-
Oct 2017
To comply with nov #201030664: repair windows, skylights, gutters. to comply with nov #201133322: remove concrete retaining walls & stairs at rear yard. replace interior stairs to 2nd fl., new stairs to basement. new dormers with bath at 2nd fl. new habitable space at basement storage/crawl space.
-
Jul 2018
Provide installation sequence plan with permeation grout to accomodate foundation excavation.
2 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early residents. Submit an update