200–216 Eddy Street
Hotel
-
1910
Built as rooming house with 111 rooms and 40 baths, to the design of the architect Ralph Warner Hart. Five storeys over a basement, three-part vertical composition, Renaissance/Baroque ornamentation.
-
1911
Built.
-
October 1971
The Ritz, a residential hotel, had 104 units, of which 30 were vacant.
-
Feb 1983
Parapet reinforcing.
-
May 1988
Repair fire/water damage, structural repair @ one unit.
-
Aug 1990
Non substantial alterations to residential hotel, volutary s.
-
Apr 1992
Revisions to 9015931.
-
Jun 1992
Fire sprinklers alteration & modify the system to existing.
-
Jun 1993
Replace sidewalk & subsidewalk structure.
-
Apr 2009
Replace existing cab and machine. provide accessible elevator lobbies.
-
Jul 2009
Install new door holder at each elevator lobby and a smole detector and horn strobe in the mechanical room and power shunt trip.
-
Nov 2010
Complete ada scope of work remaining at tenderloin neighhood dev.corp. which is part of expired/unclosed permits. entry storefront to ada compliance, including ramp, restrooms, stair.
-
Oct 2011
Reroofing.
-
between 2014 and 2016
Judi Iranyi photographed the property, showing Daldas Grocery.
-
Mar 2020
Like for like installation of fir alar system in sprinklered building. replace e facu with new 6820 fire alarm control uits, annunciator, power supply, pull station, smoke detecot heat detector new modules and ae 7707.
-
Aug 2020
General renovation of existing residential group housing and voluntary seismic upgrade.
-
Jun 2021
Add on to existing fire alarm system due to newly remodeling 14 ada rooms to occupy with sec. 1103.7.6.1 with new power supply panels, low frequency horn/strobes inside rooms, smoke detectors. install relay modules to monitor fsd (installed by others). #2020-0806-1226, #2020-0311-6754.
-
Jul 2021
Add on to existing fire alarm system to upgrade all standard units to comply with sec 1103.7.6.1 w low frequency sounder inside. install 2 way comm system (per owner request) at the landing serving each elevator. ref pa 2020-0806-1226, 2020-031-6754 and 2021-0610-2141.
-
Sep 2021
Micropile foundations for shear wall and moment frames for work under approved permit application 202008061226.
-
Jan 2022
Relocate and add sprinkler heads to new ceilings in basement on 4th floor.
-
Aug 2022
Minor revision to permit 202112084018 to reflect changes to bathrooms at mobility one unit, smoke detectors, sidewalk.
-
Aug 2023
Sidewalk replacement and waterproofing over sub-sidewalk basement roof slab.
-
Aug 2026
To partially comply with nov#202535288 to legalize unpermitted tenant improvement.
DBI holds 70 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 70. 7 of them are nominal $1 street-space or sidewalk permits. 5 expired permits are not shown.
Nearby
- 163–181 Eddy Street Same street
- 201–225 Eddy Street Same street
- 225 Taylor Street Same block
- 230–232 Eddy Street Same block
- 234–238 Eddy Street Same block
- 301 Ellis Street Same block
- 144–164 Taylor Street Around the corner
- 141–149 Taylor Street Around the corner