200–216 Eddy Street
Tenderloin · San Francisco, CA 94102
Permit history
-
Jan 1983
Repair roofing, etc.
-
Feb 1983
Parapet reinforcing.
-
May 1988
Repair fire/water damage, structural repair @ one unit.
-
Aug 1990
Non substantial alterations to residential hotel, volutary s.
-
Apr 1992
Revisions to 9015931.
-
Jun 1992
Fire sprinklers alteration & modify the system to existing.
-
Jun 1993
Replace sidewalk & subsidewalk structure.
-
May 1997
Reroofing.
-
Jul 1999
One-stop expansion of residential hotel, expand dac to manag.
-
Jun 2001
Remodel existing office upgrade toilets to accesible toilets.
-
Jun 2001
Add partitions remodel front facade make accessible entry flooring at front.
-
Apr 2009
Replace existing cab and machine. provide accessible elevator lobbies.
-
Jul 2009
Install new door holder at each elevator lobby and a smole detector and horn strobe in the mechanical room and power shunt trip.
-
Nov 2010
Complete ada scope of work remaining at tenderloin neighhood dev.corp. which is part of expired/unclosed permits. entry storefront to ada compliance, including ramp, restrooms, stair.
-
Oct 2011
Reroofing.
-
Mar 2020
Like for like installation of fir alar system in sprinklered building. replace e facu with new 6820 fire alarm control uits, annunciator, power supply, pull station, smoke detecot heat detector new modules and ae 7707.
-
Aug 2020
General renovation of existing residential group housing and voluntary seismic upgrade.
-
Jun 2021
Add on to existing fire alarm system due to newly remodeling 14 ada rooms to occupy with sec. 1103.7.6.1 with new power supply panels, low frequency horn/strobes inside rooms, smoke detectors. install relay modules to monitor fsd (installed by others). #2020-0806-1226, #2020-0311-6754.
-
Jul 2021
Add on to existing fire alarm system to upgrade all standard units to comply with sec 1103.7.6.1 w low frequency sounder inside. install 2 way comm system (per owner request) at the landing serving each elevator. ref pa 2020-0806-1226, 2020-031-6754 and 2021-0610-2141.
-
Sep 2021
Micropile foundations for shear wall and moment frames for work under approved permit application 202008061226.
-
Jan 2022
Relocate and add sprinkler heads to new ceilings in basement on 4th floor.
-
Aug 2022
Minor revision to permit 202112084018 to reflect changes to bathrooms at mobility one unit, smoke detectors, sidewalk.
-
Aug 2023
Sidewalk replacement and waterproofing over sub-sidewalk basement roof slab.
-
Aug 2026
To partially comply with nov#202535288 to legalize unpermitted tenant improvement.
DBI holds 70 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 70. 7 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update