230–232 Eddy Street
Tenderloin · San Francisco, CA 94102
-
1927
Built.
-
1928
Olympic Hotel, designed by F. Frederic Amandes and Charles O. Clausen.
-
Jul 1983
To bring into code.
-
Oct 1983
Install sprinkle & fire escaper.
-
Oct 1986
Come-off existing sprinkler system & sprinkler restaurant.
-
Nov 1990
Reroofing.
-
Dec 2000
Provide new concrete and metal stair and landing to replace bottom portion of exist bridge connectio.
-
Mar 2001
Renovations to existingbldg consisting of new-replacement windows, new roof, upgrades to plumbing, etc.
-
Jan 2003
Previous app 200103235139 s1 add 187 heads to the residential units closet. fromex existing approved.
-
Jan 2003
New fire alarm throughout.
-
Oct 2006
Tic of existing commercial space to provide new office, upgrade mechanical system and add electrical outlets, phone jacks, computer hook ups.
-
Dec 2006
Tenant improvement for respite center first floor, 2 add/relocate, 2 sprinkler heads.
-
Feb 2007
Install 1 pull station, 1 smoke detector, 1 duct smoke detector, 2 horn/strobes, 2 strobes, devices being added to e fa system.
-
Sep 2013
Construct new structural concrete ramp -structural. remove existing concrete ramp.
-
Aug 2015
1st & 2nd floors: add 3 fire sprinkler to unsprinkled rooms. maher na.
-
Jul 2017
Addition of (34) evacuated tub solar collectors, (1) 2900 gal solar storage tank, pumps and misc controls. existing plumbing permit pp20170321902.
-
Oct 2017
Voluntary seismic strengthening of the lateral force resisting system. voluntary accessibility upgrade at building entrance.
-
Nov 2017
Replacement of existing exterior stair landing with new, in-kind; stair & landing are required means of egress. n/a maher.
-
Jul 2018
Addition of new ext bld maintenance system on the roof. no increase to cabinet or size of condiditoned space. per ab-093 table 1 green bld reqs of the sq ft green bld code do not apply.
-
Sep 2018
Installation of emergency responder radio coverage system.
-
Apr 2019
Connecting errcs system to existing fire alarm system.
-
Aug 2019
Like for like replacement of existing fire alarm system.
-
Aug 2019
Inkind repair of damaged 5'-long metal fire escape ladder at top and behind the parapet. repair in-kind ladder of existing fire escape behind parapet to roof, approx 5 feet in length. repair does not change existing egress, repair occurs behind southern parapet.
-
Jun 2021
Sq ft errcs rebanding and equipment upgrade.
-
Sep 2022
As-built rev to 2019-0813-8705 - add 2 smoke detectors per fire inspectors request in community room; replaced 7 existing power supplies like-for-like. no residential room will be removed, converted or demolished. replace mini horns with lf sounders to comply with sffc 1103.7.6.1.
-
Jan 2023
(22) double hung windows in kind wood in wood out tod sash with ogee luggs. (windows are street facing).
DBI holds 28 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 28. 1 of them are nominal $1 street-space or sidewalk permits. This building's context statement dates the work 1928; the assessor's roll records the parcel as built 1927.
Nearby
- 200–216 Eddy Street Same street
- 233–235 Eddy Street Same street
- 225 Taylor Street Same block
- 234–238 Eddy Street Same block
- 355–357 Ellis Street Same block
- 369 Ellis Street Same block
- 281–285 Ellis Street Around the corner
- 275 Ellis Street Around the corner