364 Eddy Street
Tenderloin · San Francisco, CA 94102
Permit history
-
May 1973
Created during job card conversion on: 04/19/84.
-
May 1982
Building use: hotel.
-
Oct 1983
Additions alterations or repairs.
-
Aug 1986
Reinforce existing parapet at four sides of the building.
-
Nov 1986
Adding 80 sprinkler to existing sprinkler system.
-
Jun 1995
Seismic retrofit- umb.
-
Apr 2003
Install 5 new sprinkler heads in basement, boiler room and elevator room per sffd inspector.
-
Apr 2005
Install fire rated doors with selt closers & galv sheet metal lining at carbage closets on 2, 3, 4 fl.
-
Apr 2005
Install 1 in each of new trash room on floor 2-5th. a total of (4) heads all together.
-
Dec 2006
Install n ada compliant lift 1st floor, install n ada restroom. fire alarm sep permit.
-
Mar 2008
Renew permit application 200612190121 for final insp.
-
May 2013
To comply with ordinance 029 of grab bars, min. load rating of 250 lbs.
-
May 2017
One unit: window upgrade /replacement in-kind due to fire damagne per complaint #201770251.
-
Mar 2019
To comply with complaint #201931882 dated 2/27/2019, repair damage caused by a fire, work in one unit, no structural work under this permit per nov. drawings wre not required for this reapair permit per nov.
-
Apr 2019
To comply with nov#201931701 in it's entirety. replace common area interior middle & rear stairwell hand railings (wood).
-
Dec 2021
Like for like fire system replacement with new control panel, smoke det. and pull stations at the same location. tie in existing flow switch to new panel. install new low frequency horns inside all rooms. tie in existing horn/strobes in common area to new panel.
-
Feb 2025
Re-do bathroom wall + floor (2nd floor). replace room door at one unit. replace flooring + fix walls in one unit; 216 & 217. paint room # 117; 216 & 217.
-
Jun 2025
Window repair - 32 total facing street. in kind like for like. (counterweight, ropes, locks)same size, same locations, max u-factor 0.30.
-
Jun 2025
5th floor - bathroom remodel: replace bathtub with stall shower.
-
Aug 2025
3rd floor bathroom remodel, replace tub with stall shower.
-
Nov 2025
4th fl: bathroom remodel: replace tub with stall shower.
3 nominal $1 street-space or sidewalk permits are omitted from the timeline.