364 Eddy Street
Hotel
-
1909
Built.
-
1911
Built as rooming house with 87 rooms and 48 baths, to the design of the architect L. M. Gardener. Five storeys over a basement, brick structure with glazed brick veneer, two-part vertical composition, Renaissance/Baroque ornamentation.
-
March 1966
The Redevelopment Agency photographed the property, then the Hotel Elm.
-
May 1982
Building use: hotel.
-
Oct 1983
Additions alterations or repairs.
-
Aug 1986
Reinforce existing parapet at four sides of the building.
-
Jun 1995
Seismic retrofit- umb.
-
Apr 2003
Install 5 new sprinkler heads in basement, boiler room and elevator room per sffd inspector.
-
Apr 2005
Install fire rated doors with selt closers & galv sheet metal lining at carbage closets on 2, 3, 4 fl.
-
Apr 2005
Install 1 in each of new trash room on floor 2-5th. a total of (4) heads all together.
-
Mar 2008
Renew permit application 200612190121 for final insp.
-
May 2013
To comply with ordinance 029 of grab bars, min. load rating of 250 lbs.
-
May 2017
One unit: window upgrade /replacement in-kind due to fire damagne per complaint #201770251.
-
Mar 2019
To comply with complaint #201931882 dated 2/27/2019, repair damage caused by a fire, work in one unit, no structural work under this permit per nov. drawings wre not required for this reapair permit per nov.
-
Apr 2019
To comply with nov#201931701 in it's entirety. replace common area interior middle & rear stairwell hand railings (wood).
-
Dec 2021
Like for like fire system replacement with new control panel, smoke det. and pull stations at the same location. tie in existing flow switch to new panel. install new low frequency horns inside all rooms. tie in existing horn/strobes in common area to new panel.
-
Feb 2025
Re-do bathroom wall + floor (2nd floor). replace room door at one unit. replace flooring + fix walls in two rooms. paint three rooms.
-
Jun 2025
Window repair - 32 total facing street. in kind like for like. (counterweight, ropes, locks)same size, same locations, max u-factor 0.30.
-
Jun 2025
5th floor - bathroom remodel: replace bathtub with stall shower.
-
Aug 2025
3rd floor bathroom remodel, replace tub with stall shower.
-
Nov 2025
4th fl: bathroom remodel: replace tub with stall shower.
3 nominal $1 street-space or sidewalk permits are omitted from the timeline. 3 expired permits are not shown.
Nearby
- 355 Eddy Street Same street
- 366–398 Eddy Street Same street
- 340 Eddy Street Same block
- 463–465 Ellis Street Same block
- 455–457 Ellis Street Same block
- 334 Leavenworth Street Same block
- 317 Leavenworth Street Around the corner
- 240 Leavenworth Street Around the corner