555 Eddy Street
Tenderloin · San Francisco, CA 94109
Permit history
-
Dec 1983
To bring building code.
-
Jan 1988
Renovation and repair of existing front of building.
-
Mar 1988
Repair handrails, entry stairs.
-
Dec 1988
Parapet-balconies & cornice only, re #8800006.
-
Jun 1991
Enlarge one first floor unit by enclosing portion.
-
Mar 1992
Termite repair.
-
Nov 1992
Rev #9109784. delete part of 1st floor plan. install gyp board.
-
Feb 1993
Permit renewal inspection #9109784-vol seis upgr& inter alte.
-
Feb 2000
Install wrought gate with door closer & inter-com system.
-
Nov 2013
One unit all work done in one unit, remove/add interior walls, remodel kitchen and bath, new lighting to modified spaces.
-
Mar 2014
#3- replace existing plumbing fixtures & electrical fixtures with new, replace cabinet cabinet with new, replace tiles in bathroom, replace hardwood floor, paint.
-
Apr 2014
One unit: remove and add interior walls. remodel kitchen and bath. new lighting to modified spaces.
-
Apr 2014
One unit: remove and add interior walls. remodel kitchen and bath.add washer and dryer. in-fill vent shaft window in hallway. new lighting to modified spaces.
-
Jun 2014
One unit - remodel existing studio, demolition existing bearing interior wall, remodel kitchen & bath, lighitng to remodelled areas. new post & beam.
-
Jun 2014
Reroofing.
-
Aug 2014
All work done in one unit. remove/add interior non-bearing walls. remodel kitchen & bath. add washer/dryer. new lighting to modified spaces.
-
Dec 2014
#32 - remodel kitchen, plumbing & electrical by separate permit.
-
Apr 2015
Kitchen and bathroom remodel in one unit 3rd floor existing hood and lighting to remain. no walls to be moved/ no structural work. all fire rated assemblies to be maintained.
-
May 2015
One unit: remodel kitcheb and remove partial partition wall per plan.
-
Jun 2015
Waterproofing (2) balcony decks with urethene coating. n/a maher ord. # 155-13.
-
Aug 2015
Kitchen and bath remodel. upgrade electrical in one unit. no walls to be removed or altered.
-
Feb 2017
One unit: remodel kitchen and bathroom, like in kind. paint unit and install new vinyl flooring. existing flooring to remain. no structural work.
-
Dec 2023
Install new facu and equipment to meet 1103.7.6.1 install new lf sounders inside every dwelling unit.
3 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early residents. Submit an update