201–229 Ellis Street
Tenderloin · San Francisco, CA 94102
Permit history
-
Apr 1983
Additions alterations or repairs.
-
Nov 1985
Install 2 community kitchens.
-
Feb 1997
Repair, remove and replace.
-
Jul 2001
Seismic retrofit for umb ordinance bolts install to be routed to umb phase i of bolts plus.
-
Sep 2002
Phase ii of umb bolts plus upgrade of improvements for appl#200107304791.
-
Oct 2005
Umb, retrofit phase ii, interior bracing to reinforce existingmasonry structure.no other work.structural work only.
-
Jan 2007
Temporary shoring for work on adjacent property (125 mason - reference permit application 200608038557s). complain #200340273. 200557129 & 200557131.
-
Apr 2007
Demolition all interior, non structural elements. no structural work-soft demolition. t.i. under seperate permit.
-
May 2007
Shoring and underpinning for work on adjacent property at 149 mason street (refer permit application 200608038553s).
-
Jun 2007
Seismic rehab for unreinforced brick masonry (umb) building. 'special procedure". install new handicap push button auto door opener, partial handicap upgrade in existing restroom. no mep. work under this permit.
-
Jul 2016
Foundation work for future addition, future addition under seperate permit. (vacant building, all ada upgrades to be under future buildout).
-
Feb 2017
Demolition of interior non load bearing partitions, plumbing, finishes, lighting and non structural components. ab-017.
-
May 2017
Structural only demolition & seismic upgrade project in an existing unoccupied residential building.
-
May 2018
Fifty five group housing rooms are proposed along with the addition of a new 5th floor.
-
Sep 2019
Ref #1490885. new nfpa 13 & 13r sprinkler system in basement, 1st, 2nd, 3rd, 4th, 5th floors, & 6th fl stairwells #1 & 2; & corridors/common areas & manual wet type class i standpipe (ref permit application 201804277608).
-
Sep 2019
Installation of hydrponic hot water heating system with boilers & hydronic wall hung heat emitters.
-
Oct 2019
Mechanical only: replace existing ventilation install all new bath exhausts, kitchen exhausts, corridor ventilation, laundry ventilation, new heating & cooling systems for top floor residential units. ref permit application 2018-0427-7608.
-
Nov 2019
Structural drawings for new sidewalk in conjunction with dpw street improvement. ref pa 2018-0427-7608.
-
Jul 2020
Title 25 electrical/lighting compliance plan check only. ref permit application 201804277608 & e/p ew201909193634. maher n/a.
-
Apr 2021
Install new fire alarm system.
-
May 2024
Update kitchhen, shower room, toilet, laundry room. no residential guest room will be removed, converted or demolished.
-
May 2024
28 window replacements like for like existing wood new wood 1st and 2nd floors.
-
Jun 2024
Four partial bathroom remodels like for like, no walls or layout changes, consisting of 3 prefab showers (shower pans). and 4 toilets, one kitchen remodel like for like.
-
Aug 2024
2nd fl remodel common kitchen & bathroom like for like. enlarge existing opening.
-
Sep 2024
Revision to permit application 202405293209 adding 10 window replacements like for like. existing wood to new wood at front and back.
DBI holds 57 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 57. 9 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update