330 Ellis Street
Tenderloin · San Francisco, CA 94102
-
Feb 1982
Additions alterations or repairs.
-
Jun 1985
Remodelling the existing kitchen and coffee room work.
-
Aug 1985
Install hood, duct work for exhaust, fresh air, fire system.
-
Mar 1989
Creat a kitchen in an existing basement dining room.
-
Jun 1989
Reroofing.
-
Sep 1995
Repair dishwashing rm, freight elev. provide hc bathrms, vent.
-
Jul 1998
One stop-remodel existing food area at lower level, new ramp.
-
Oct 1998
One-stop, remove & add new 2 1/2" topping to existing sidewalk.
-
Feb 2000
Modification to existing stage/new access lift to stage.
-
Mar 2000
Reroofing.
-
May 2000
Remove/replace topping of existing sidewalk.
-
May 2000
Remove existing damaged walk & add new two and a half topping to existing sidewalk to match existing.
-
Feb 2001
Remodel existing floor prep area at lower level. remove existing non complying ramp & replace with n.
-
Oct 2005
Work includes demolition of existing interior improvements on 6/f & construction of partitions, finishes, electrical, mechanical & plumbing systems to create new health clinic for the people in the community to replace existing clinic on 4/f, comply complaint 200232951 bid-insp.replace all ext windows.
-
Sep 2006
Install new facu on the 1st floor to monitor new fire alarm devices on the 6th floor. equipment on 1st floor through 5 and the basement are to remain as is and will remain connected to the existing local facu.complaint #200232951 bid-insp.
-
Jun 2009
Restoration of historic steel gates on taylor street. new interior doors & storage closet in taylor collonade. new ramp ramp @ freedom hall. restripe parking lot within new accessible stall.
-
Oct 2009
Addition of 1 ada compliant restroom to 5th floor. conversion of 1 existing restroom to 2 ada compliant restrooms on 5th floor. barrier removal only.
-
Oct 2010
Demolition of interior non-load bearing partitions on fifth floor. soft demolition per sfbc ab-017.
-
Jun 2011
5th floor - interior storefront partitions & casework, new flooring.
-
Dec 2011
Replace existing devices to complete the fire alarm upgrade.
-
Jul 2016
2nd floor: renovation of 2existing restrooms & introduction of a gender neutral restroom to each mens * womens restrooms. 3existing windows will be replace with new - same size, energy eff. hwh (instant) added for hw to lavs - all new finishes & fixtures. maher na.
-
Sep 2020
Like for like replacement of an existing fire alarm system to allow to provide service. ref permit application 201111271319.
-
2024
Glide Memorial United Methodist Church is listed individually on the National Register of Historic Places for its social history, African American and Asian American heritage and its architecture, and is a contributing building in a district. Identified in 2024 as eligible for city landmark designation as well.
-
Feb 2024
Replacement of the existing railings at existing metal staircase. back side of building.
-
Feb 2024
Revision to permit application 202402206130, replacement to existing metal staircase in back of building.
-
Sep 2025
Reroofing patch job. no torch down remove existing terra cotta tile and replace in same place after reroofing. using same tile and replacing where needed.
DBI holds 44 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 44. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update