Know This Place

District 5 · Block 0324, Lot 002 · ZIP 94102

345 Taylor Street

Hotel · Tenderloin

  • 9 stories
  • 50,403 ft2
  • 7,218.75 ft2 lot area
  • 114 residential units
  • 131 rooms
  • 115 bathrooms
  • Zoned RC-4
  • Historic resource
  • Sold August 3, 2015
Land$15,839,093
Improvements$10,559,396
Total assessed$26,398,489
37.7856, −122.4116 Street View appears here once a Google Maps embed key is configured.
  1. 1926

    Built as mid-priced hotel with 125 rooms and 115 baths, to the design of the architect John C. Hladik. Eight storeys over a basement, steel frame and reinforced concrete structure, two-part vertical composition, Renaissance/Baroque ornamentation.

    National Register of Historic Places nomination, National Park Service
  2. March 1966

    The Redevelopment Agency photographed the property, then the Hotel Don.

  3. Oct 1981
    Permit 8109146 $$$ $142,000

    Additions alterations or repairs.

  4. Sep 1983
    Permit 8308872 $$$ $9,000

    Remodle existing regcreation room to provide bathing, toilet.

  5. Apr 1988
    Permit 8804541 $$$ $26,000

    Demolition nonload bear partitions, ceilings, trim & fixtures.

  6. May 1988
    Permit 8805844 $$$ $490,000

    New partitions, ceilings, lighting to existing hotel lobby.

  7. Jun 1988
    Permit 8807334 $$$ $11,000

    Add a new stair and opening to the mezzanine.

  8. Jun 1988
    Permit 8807335 $$$ $300,000

    Convert 9th fl suite into 6 questrms, new demising walls.

  9. Jun 1988
    Permit 8808075 $$$ $17,000

    Install fire sprklr system on ground floor.

  10. Sep 1994
    Permit 9414330 $$$ $10,300

    Add a 44'x4'6" high x 3'6" projection marque to front.

  11. Nov 2005
    Permit 200511218678 $$$ $45,000

    To install fire sprinkler system to comply wtih ord#377-93-high rise ordinace existing ug + riser.

  12. Jul 2010
    Permit 201007267467 $$$ $180,000

    Demolition existing penthouse dwelling unit and replace with new penthouse dwelling unit. the unit is owner occupied.

  13. Apr 2012
    Permit 201204107957 $$$ $8,000

    Expansion to existing fire sprinkelr system. remove 2 sprinklers, add 16 sprinklers (penthouse).

  14. Feb 2016
    Permit 201602038695 $$$ $132,000

    Interior renovation of existing non-accessible hotel guest bathrooms. work includes removal & replacement of existing plumbing fixtures & finishes in bathrooms.no change to occupancy or egress. maher n/a.

  15. Feb 2016
    Permit 201602190022 $$$ $3,200

    Scope consists of infilling existing door, creating new interior wall opening in meeting room and painting building exterior. no change to occupancy or egress. no mep scope. n/a for maher.

  16. Mar 2016
    Permit 201603020975 $$$ $320,000

    Scope consists of the reconfiguration of lobby restrooms, lobby area and fitness room. no change to occupancy or egress. no exterior work. mep under separate permit. maher na.

  17. Mar 2016
    Permit 201603303449 $$$ $15,000

    9th floor - revision to permit application 201602038695: scope of work is interior renovation of existing non-accessible hotel guest bathrooms work includes removal & replacement of existing plumbing fixtures & finishes in (4) bathrooms #912, #915, 916, 917. no change to occupancy or egress.

  18. May 2016
    Withdrawn Permit 201605046546 $$$ $14,000

    Upgrade electrical & plumbing fixtures in 7 ada rooms (on levels 5-9) and upgradeing 12 rooms with hearing impaired capabilities. maher na.

  19. May 2016
    Permit 201605137435 $$$ $97,500

    Scope consists of new lighting layout in hotel lobby and fitness room, and upgrading the plumbing, mechanical and electrical in lobby restrooms. reference permit 201603020975; no change to occupancy or egress; maher n/a.

  20. Jun 2016
    Permit 201606028940 $$$ $30,000

    Interior renovation of existing non-accssible guest bathrooms. work includes removal & replacement of existing plumbing fixtures and finishes in (7) bathroom on 5th - 9th floor. revision to permit 2016-0203-8695. no change to occupancy or egress. existing lighting & hvac to remain.

  21. Jun 2016
    Permit 201606291176 $$$ $35,000

    Revision to pa 2016-0302-0975. scope revisions include cafe ti equipment layout. & mep work. minor modifications to lobby. no exterior work. remove acrylic sheet from beneath skylight. correct bottom step conditoin shown on base bpa noted above. compliance with maher ordinance no 155-13.

  22. Aug 2016
    Issued Permit 201608185450 $$$ $27,000

    Scope of work includes restaurant redesign with new bar, lighting, and kitchen prep area. existing kitchen equipment to remain. no change in occupancy, mep and kitchen design to be under seperate permit.

  23. Sep 2016
    Permit 201609157875 $$$ $35,000

    Plumbing and electrical design for bar equipment, restaurant lighting, new kitchen prep space sesign. e kitchen equip to remain. ref 201608185450. no change in occupancy. n/a ordinance #155-13.

DBI holds 54 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 54. 8 of them are nominal $1 street-space or sidewalk permits. 3 expired or cancelled permits are not shown.