Permit history
-
May 1984
Parapet program.
-
Aug 1985
Install one hour partition.
-
Oct 1997
Umb general procedure.
-
Aug 1999
To abate nov-9901058-repair existing steps, install tiles.
-
Jun 2001
Repair approx 16 sq ft. of masonary retaining wall at rear of building. per notice 200009633.
-
Jul 2002
Install new fire alarm system.
-
Oct 2002
Install fire sprinklers on 1st floor in lobby, intall fire sprinklers on 2nd, 3rd, 4th floors in rms.
-
Jun 2003
Correct violation in complaint#9901919. includes documentation interior walls and rebuilding h.c. ra.
-
Nov 2005
1 wall constructed with 2 windows and 1 door to form a private office - no electrical.
-
Apr 2011
Sidewalk repair comply with nov 201084126.
-
Feb 2012
Revision to permit application 2011-0422-4597-for sidewalk repairs due to utilities lines are on the way.
-
Jun 2013
Installing grab bars in all common bathrooms per ordinance #029-13.
-
Oct 2013
Repair and replace water damaged plasters to comply with nov 201331671 and nov 201329462 #6 in report.
-
Dec 2013
Replace entrance doors for rooms 109, 210, 230, 228, 312, 317 & 417, to abate items #4 from nov #201334091, #2 from nov #201335631, and #3 from nov#201333561.
-
Apr 2014
Repair or renail subfloor around toilet of bathroom to abate item #6 of nov #201449593.
-
Jan 2016
Like for like voluntary fire system replacement, replace existing fire control panel, , smoke detectors & pull stn with new the same location.existingnotification appliances reconnect to new power supply panels, install monitor modules to tie-in waterflow & tamper switches.
-
Mar 2016
Replace 109 room doors in kind, new vinyl composition tiles for hallway and room throughout, replace broken outlets & lighting as needed.replace toilets & sinks as needed comply with nov 201699813, 201602961, 201602932, 201602861; maher n/a.
-
Jun 2016
Reroofing.
-
Aug 2016
Renovating private bathrooms floors 1-4, units #s 109, 202, 205, 210, 216, 219, 226, 227, 230, 302, 3015, 309, 326, 327, 330, 402, 405, 428: like for like replacement existing 18 toilets, existing 18 showers, existing 18 exhaust fans, new gfi outlets, existing 18 existing lights, existing 18 doors and frames. to comply with nov #201625063.
-
Aug 2016
Replace door and frame manager's one unit. floors 1-4: modify doors to trash rooms to be tight fitting, install self closers and vents. comply with nov #201608491 & nov #201607341.
-
Sep 2016
1) add kitchen, laundry and 1 bathroom to 1st floor. 2)add a storage rooms to basement. work is in community area/use. n/a for maher.
-
Feb 2018
Replace and install grab bars in shower tub stall in one unit. n/a maher.
-
Mar 2019
Add on to e system 201601147133, new smoke detector and relay modules for elev recall in basement. new devices will be tie in to e panel located on 1st fl.
-
Aug 2024
1/f common bathroom -comply with nov #202426267 repair damaged walls and paint.
DBI holds 32 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 32. 3 of them are nominal $1 street-space or sidewalk permits.