405–415 Taylor Street
Tenderloin · San Francisco, CA 94102
-
1925
One of the two downtown buildings of any prominence among the roughly 600 its architect designed.
-
Feb 1982
Additions alterations or repairs.
-
Mar 1983
Additions alterations or repairs.
-
Mar 1988
Interior partitions & finish work @ 1st floor.
-
Jan 1991
Design & install shoring system consist of underpinning peir.
-
May 1992
Remove & replace sheet metal panels at roof.
-
Feb 1997
Replace pump system for fire hose reel cabinets.
-
Sep 1998
Revise existing guestrms for 7 with accessible baths with shower.
-
Sep 1998
Soft, non-structural interior demolition only.
-
Nov 1998
Installation of a highrise fire alarm & life safety system.
-
Feb 1999
Additions alterations or repairs.
-
Feb 1999
Revision to appli#-09824450.
-
Apr 1999
One stop: redecorate existing rest., food prep, on mezzanine, etc.
-
Jan 2004
Erect double face electric projecting sign.
-
Feb 2004
3-section awning, posts in sidewalk.
-
Dec 2009
Exterior window replacement, painting, and masonry and sheet metal maintenance/repair. highrise building no rescue window required. new doors on roof.
-
Apr 2011
Remove existing fabric awning & install new exterior metal awning.
-
May 2015
Demolition and renovation of the existing lobby of ext 16 story hotel that will include the addition of an entry vestibule, new flooring, wall panels to screen and protect existing historic elements. mep & fire protection work under separate permits.
-
May 2015
Scope of work is replacement of existing mezzanine level windows with new windows to match existing, glazing shall be vision glass, convert two (2) existing conference rooms into 5 guestrooms. also improve existing fitness room & existing office space in basement level. n/a ordinance #155-13.
-
May 2017
Project scope consists of the select demolition & renovation of public space areas. hotel lobby, work includes demolition & construction of walls, ceilings, floors, fixtures & finishes. no exterior work. no change in egress. no plumbing work perform on this permit.
-
Jun 2017
Barrier removal only. scope consists of 10 guestrooms to current accessibility code req. accessible rooms levels 2-11. additional 17 guestrooms updated with communication features. no exterior work. fire life safety under separate permit.
-
Aug 2017
Accesible rooms ref bpa#201706300767. renovation of non-accessible guestrooms in a 16 story hotel. work on floors 2-17. includes select demolition and construction of walls, ceilings, fixtures and finishes. no change in egress.
-
Aug 2017
The project scope consists of the renovation of public spaces in a 16-story hotel on the basement & mezz fl. specific work will include the select demolition & construction of walls, ceiling, fixtures and finishes, no change to egress. no exterior work in this permit, no work in the historic lobby.
-
Jan 2018
Fire alarm ti - add 17 speaker/strobes in sleeping room 17 strobes in bathrooms, 17 smk det with sounder bases, 17 control modules, 2 monitoring modules for power monitoring & 1 power supply- low fregancy sound addedref # 201706300767.
-
Jul 2023
Replace existing f/a panel with new notified nfsz-3030, new speakers will be added in bedrooms/guest rooms to match sq ft sleeping, (1) f/a control unit, (182) smoke detectors, (3) duct detectors, (1) heat detector, (16) speaker ceiling mounts.
-
May 2025
Provide new fire smoke damper at top of the stairwell for smoke relief. tie the fire smoke damper into the existing fire alarm system.
DBI holds 73 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 73. 11 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants and the date of the last recorded sale. The assessor dates the building to 1912; the city's historic context statement for this area gives 1925. Submit an update