550 Geary Street
Hotel · Tenderloin
-
1929
The Adigo Hotel, designed in the Spanish Revival style by Douglas D. Stone of Stone & Mulloy.
-
1929
Built as the Hotel El Cortez, Hotel Adagio, to the design of the architect Douglas D. Stone. Fourteen storeys over a basement, steel frame and reinforced concrete structure, setback skyscraper composition, Spanish Colonial Revival ornamentation.
-
Apr 1982
Otc alterations permit.
-
Apr 1988
Remove partition walls to enlarge bathrm & bedrms @ 7th floor.
-
Apr 1988
Remove partition walls to enlarge bathrm & bedrms @ 8th floor.
-
Apr 1988
Remove partition walls to enlarge bathrm & bedrms @ 9th floor.
-
Apr 1988
Remove partition walls to enlarge bathrm & bedrms @ 10th floor.
-
Apr 1988
Remove partition walls to enlarge bathrm & bedrms @ 4th floor.
-
Apr 1988
Remove partition walls to enlarge bathrm & bedrms @ 3th floor.
-
Apr 1988
Remove partition walls to enlarge bathrm & bedrms @ 6th floor.
-
Apr 1988
Remove partition walls to enlarge bathrm & bedrms @ 5th floor.
-
Apr 1988
Remove partition walls to enlarge bathrm & bedrms @ 11th floor.
-
Apr 1988
Remove partition walls to enlarge bathrm & bedrms @ 15th floor.
-
Apr 1988
Remove partition walls to enlarge bathrm & bedrms @ 14th floor.
-
Nov 2002
Remodel guestroom, work to include bathroom fixtures, hc guestrooms to remodel, 0584lobby.
-
Apr 2003
New life safety system with smoke detection and ada signaling throughout.
-
Apr 2003
Build out of existingrestaurant space. work includes new finishes throughout, new lighting, new bar.
-
Dec 2011
Demolition 6 satellite dishes and install new mechanical platform and mechanical screen on roof for new chiller that is installed under separate application. also, install electrical service for chiller that is install under separate application.
-
Dec 2011
Installation of a new chiller system and 4 pipe fan coils.
-
Jan 2012
Removal and replacement of existing wall and floor finishes in guest rooms and corridors on floors 2016. project to include minor alterations to existing accessible guest room suites to comply with current code requirements.
-
Feb 2012
Interior remodel of existing bar, existing restrooms & existing hotel lobby with new finishes throughout.
-
Feb 2013
This is a voluntary upgrade of the existing fire alarm tone to voice evacuation fire alarm system based on a2, b, and r-1 occupancies. ref permit application 2013/01/18/8266.
-
Jan 2022
Select work in 129 guestroom bathrooms. rooms in scope will feature a tub to shower conversion, including new tile & fixtures. fire life safety under separate permit. no exterior work.
-
Mar 2022
Interior remodel of hotel public spaces on level 1 and 2. specific work includes new flooring, removal and addition of select doors and new built in cabinets. level 2 work is in existing fitness center. level 1 work in existing lounge, breakfast room and meeting room.
DBI holds 73 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 73. 6 of them are nominal $1 street-space or sidewalk permits. 3 expired permits are not shown.
Nearby
- 549–561 Geary Street Same street
- 560 Geary Street Same street
- Gaylord Hotel Same block
- 580–598 Geary Street Same block
- 675 Post Street Same block
- 516–528 Geary Street Same block
- 552–556 Jones Street Around the corner
- 546–548 Jones Street Around the corner