650 Geary Street
Tenderloin · San Francisco, CA 94102
-
1917
Built for the Shriners to a Moorish design.
-
Mar 1986
Demolish 1 corner of exter. wall to remove encroachment.
-
Mar 1987
Repair alcazar theater -- some partition work for stairs.
-
Dec 1987
Parapet repair.
-
Jun 1989
Roof repair, framing, sheathing shoring of structure.
-
Jul 1989
Wall installation and revised original.
-
Jul 1989
Parapet work.
-
Nov 1990
Repair terra cotta facade brace 2 columns at 2/f.
-
Nov 1990
Repair interior finishes, handicap restrooms.
-
Dec 1990
Reroofing.
-
Feb 1991
Handicap ramp for entry structural.
-
Apr 1991
Fixed seating & wheelchair spaces layout & path of existingplans.
-
Apr 1991
Replace existing hvac with new unit for theatre area only.
-
Dec 1991
Selective non structural demol to aid, archit. & struct.eng.
-
Jan 1992
Bpa conditions #1991-046 appl #9023994.
-
Jan 1992
Bpa conditions #1991-057 appl #9101762.
-
Jun 1992
Modify exist fire sprinkler sysin basemt & 5th floor.
-
Mar 2001
Install approx.12'new 2x4" studwall & new door to an existing office with new electrical, heater, insulat.
-
Apr 2009
Replace damage wall between garage & retail. not visable from street.
-
Nov 2012
Comply with complaint #200996763 nov) renew permit application 200904236997 for final inspection.
-
Jul 2018
Reroofing. to meet cool roof requirements.
Not yet documented: the developer, the early tenants and the date of the last recorded sale. Submit an update