725–727 Geary Street
Tenderloin · San Francisco, CA 94109
Permit history
-
Jun 1982
Additions alterations or repairs.
-
Jan 1983
Enlarge show window, add new entrance, etc.
-
Jul 1983
To bring building into full compliance with the provions.
-
Feb 1984
Installing sprinkler system.
-
Jan 1985
Require final inspection, #8401820, 8306352, install sprinkl.
-
Mar 1986
Parapet.
-
Dec 1998
Seismic upgrd work &disability work to unreinforced building ord.
-
May 2002
Otc alterations permit.
-
Jun 2004
Remove batrhrub, add shower, remove wall to open up lobby.
-
Jul 2004
0.
-
Dec 2004
Reduce scope of work. revert back to existing condition of lobby. revision to permit application 2004/06/02/5334.
-
Oct 2005
Streetspace.
-
Sep 2017
Rooms 1 & 12: restore existing shower room to its original use: shower room one unit. close door from inside. remove tiolet, open /reopen hallway wall to install shower door. shower room in room #12, close door from the isndie. relocate sink from shower room to inside room. reopen hallway to install shwr dr.
-
Apr 2019
Recommencement and completion of work approved under permit application 2017-0906-7112.
-
Sep 2019
Code compliance or violations 201798811 create hallwy that will open up the rear fire escape for all tennants//this shall be a rated hallway.
-
Nov 2019
Legalization of basement unit per ordinance 43-14.there is an existing illegally constructed owners unit that needs to be legalized. the floor will have to be lowered about 9" in order to get proper ceiling heights. architectural design has been submitted which includes adjustments for code violati.
-
Sep 2023
Per ordinance 51-16, abe 201912029053. remove 4" step. ada entrance door, push buttons, & ramp at 1" to 12" max. remove existing door and existing windows for ada entrance.
-
Sep 2023
To comply with accessible business entrance program per ordinance 51-16. to request for technicial infeasibility. new ada entrance and list cannot be done due to lack of space and existing bearing wall. abe201912029053.