735 Geary Street
Tenderloin · San Francisco, CA 94109
Permit history
-
Aug 1982
Additions alterations or repairs.
-
Apr 1983
Additions alterations or repairs.
-
Sep 1998
Seismic upgrade to special procedure.
-
Jun 1999
Change grade beam foundation-orignl job site plans submitted.
-
Dec 2007
Work @ three units only. remove & replace existing kitchen cabinets & counter tops. replace bathroom vanitys in same units. add an electrical circuit to the bathroom & kitchen in each unit.
-
Jun 2008
Retro fit all windows, front window to be wood clade with grides, casement in front to replace old casements all other windows to be vinyl, 90 vinyl, maintain bedroom windows to meet egress window requirement.
-
Jun 2008
Work @ four units only. 4 kitchens, 4 bath remodel. no change to window, doors or exiting.
-
Jul 2009
Reroofing.
-
Jul 2009
Mta permit only.
-
Aug 2009
To obtain final inspection for work completed under permit application 200712069892; all work has been completed.
-
Aug 2009
To obtain final inspection for work completed under permit application 200806194897; all work has been completed.
-
Oct 2009
Kitchen & bathroom renovation.(kitchen) new cabinets & counter tops, new tub & cabinets & new tile (bathroom) on both two units. new lighting.
-
Mar 2010
To remove rock/plaster/wall finishes for gas line installation required for rannai low emission, direct vent heaters, 8 units heater installation under separate permit.
-
Aug 2010
Kitchen & bath (one) remodel at two units; no structural changes, no changes to windos, door, extis.
-
Oct 2014
One unit: kitchen & bath remodel. work for this unity only. no changes to doors or windows.
-
Dec 2015
One unit: remove and replace kitchen cabinets and flooring repair plumbing and electrical as needed. paint unit. replace bathroom fixtures, tuv, shower valve and tile.
-
Mar 2018
One unit renovate kitchen & bathroom all in kind, plumbing & electrical as needded, kitchen 7x8 bath 5x7.
-
Mar 2021
Voluntary fa replacement + lf sounders upgrade. replace of facu, smoke detectors, pull stations. install of new lf sounders, monitor modules, power supply, wireless communicator, relay modules.
-
Jun 2022
One unit: ilo dwelling unit at above address.
-
Oct 2025
One unit: remodel kitchen, replace cabinets and counter top. remodel bathroom: replace fixtures. replace tile in kitchen and bathroom. in-kind remodel.
-
Jun 2026
One unit: revision to permit 202510026602, add scope, added 5 windows to unit in kitchen and bathroom area, non street facing.(max. u-factor 0.58).
3 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early residents. Submit an update