Jun 1983
Comply to codes.
-
Jun 1983
Additions alterations or repairs.
-
Jan 1984
Repair damage caused by fire.
-
Jan 1986
Build stair enclosure walls.
-
Dec 1986
Remove the 6' high wood fence on rear property line.
-
Sep 1988
Reroofing.
-
Sep 1993
Umb upgrade to conform chap 15 sfbc.
-
Jun 2014
Remove existing cabinets, supply new plumbing & electrical to new kitchen & bath remodels, provide laminate flooring or refinish hardwood. paint apartment one unit. ligting & control per cec 150 (k). compliance with ord 155-13 not required.
-
Aug 2014
Two units remove existing kitchen & bath cabinets. relocate plumbing and eelctrical to new locations. tile kitchen & bath floors. install laminate flooring or rdeo hardwood. no kitchen in one unit only bathroom work, floor and paint. no walls to be removed. compliance with ord 155-13 not rquire.
-
Jul 2015
Kitchen & bath remodel 80 sq ft-kitchen, 40 sq ft-bath. n/a for maher.
-
Nov 2015
One unit: kitchen & bathroom remodel.
-
Jan 2016
One unit: kitchen & bathroom remodel, new fixtures.
-
Mar 2016
One unit: kitchen & bath remodel.
-
Apr 2016
Revision to pa 2016-0127-8155, one unit, relocate kitchen & living room to add 1 more bedroom. all fire ratings to be maintained.
-
May 2016
One unit. kitchen & bathroom remode. no walls moved, rmeoved, added or infilled. all existing layouts to remain unchanged.
-
Jun 2016
One unit: kitchen & bathroom remodel; like for like.
-
Oct 2016
One unit: kitchen & bathroom renovation. no structural work. as like layout. no walls moved, removed, added or infilled. all existing layouts remain unchanged.
-
Nov 2017
Work in one unit: kitchen and bathroom remodel/no structural changes.
-
Dec 2017
Build an exit access stairway to existing rear yard exit.
-
Jan 2018
One unit: kitchen and bathroom remodel. no structural change.
-
Mar 2018
One unit: kitchen & bathroom remodel, no structural changes, no alteration of any (4) wall or existing layout.
-
May 2019
One unit: kitchen and bathroom remodel. no structural/no exterior work. no change in wall layout. all work within unit. no fire alarm or sprinkler work required.
-
Apr 2022
One unit: kitchen & bath remodel. no structural / exterior work. no change to wall/layout. all work within unit. no fire / sprinkler work. in kind.
-
Jul 2023
Fire alarm upgrade installation of replacement fire alarm system. new fire alarm panel will be installed with notification devices throughout including lfh in all sleeping areas to comply with 1103.7.6.1.
DBI holds 26 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 26. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update